Similar Projects
Shoreline Greenway Trail Project
Infrastructure
Bidding
$300,000 est. value
East Haven, CT 06512

West River Tide Gate Flap Replacement
Infrastructure
Bidding
$1,879,858 est. value
New Haven, CT

Ward-Heitmann House Museum Drainage Improvements
Renovation
Post-Bid
New Haven, Shelton, West Haven, CT 06516

Concrete ADA Ramp and Stair Replacement Project at John C. Mead School
Post-Bid
Ansonia, CT 06401

Dale Avenue Drainage Improvements
Results
Waterbury, CT

Indefinite Quantity Construction Services for Road & Bridge Maintenance
Results
$1,000,000 est. value

Grove and Adams Street Drainage Improvements
Infrastructure
Bidding
$200,000 est. value
Waterbury, CT

East Main Street Roadway Improvement Project
Post-Bid
Ansonia, CT 06401

Miscellaneous Concrete Repairs, Waterproofing and Drainage Repairs at the Union Station Parking Garage
Results
New Haven, CT 06519

Orchard Hills Parking Lot
Infrastructure
Bidding
$400,000 est. value
Milford, CT 06460

Downtown Community Connectivity Bike and Pedestrian Improvements
Infrastructure
Post-Bid
$669,765 est. value
Naugatuck, CT

Construction Contract for Prospect Street Parking Facility
Results
Waterbury, CT 06702

Reconstruction of Concrete Sidewalks and Incidental Work at Various Locations Zone 12-B
Term Contract
Bidding
$200,000 est. value
Wallingford, CT

Drainage Improvements at Philip Place and Anthony Road
Infrastructure
Post-Bid
North Haven, CT

Saw Mill Road Over the West River Bridge
Results
$2,513,775 est. value
Guilford, CT

Last Updated 06/27/2022 05:05 AM
Project Title

Harbor Brook Channel Improvements, Trail Construction and Sewer Bridge Replacement Hanover Pond to Baldwin Pond

Physical Address View project details and contacts
City, State (County) Meriden, CT   (New Haven County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To furnish labor and materials to provide Flood Control measures at Coe Avenue to Cooper Street and the Leslie Drive Sewer Bridge.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents