Similar Projects
Good Manufacturing Practices (GMP) Lab Facility
New Construction, Infrastructure - 100,000 SF
Conception
$20,000,000 CJ est. value
Andover, MA 01810

Good Manufacturing Practices (GMP) Lab Facility
New Construction, Infrastructure - 100,000 SF
Conception
$20,000,000 CJ est. value
Andover, MA 01810

Executive Place Warehouse Development
New Construction - 224,900 SF
Design
$40,000,000 est. value
Andover, MA 01810

Construction of the New Public Works Facility - General Bid
New Construction, Infrastructure
Post-Bid
$14,800,000 CJ est. value
Rockport, MA 01966

Miscellaneous Sidewalk Improvements
Post-Bid
Less than $300,000 est. value
Salem, MA

New Public Works Facility - Sub
New Construction, Infrastructure
Results
$4,879,686 CJ est. value
Rockport, MA 01966

Paving and Accessibility Upgrades
Results
Less than $1,500,000 est. value
Haverhill, MA

Grove Street Apartments - Site Development Only
New Construction
Construction
Salem, MA 01970

Danton Drive Warehouse
New Construction, Infrastructure - 58,300 SF
Pending Verification
$6,000,000 CJ est. value
Methuen, MA 01844

Tropical Products Manufacturing Building
New Construction, Infrastructure - 70,000 SF
Pending Verification
$38,000,000 CJ est. value
Salem, MA 01970

Lawrence High School Sidewalk Repair Project
Post-Bid
Lawrence, MA

Scheduled and Emergency Resurfacing and Related Work at Various Locations
Results
$2,855,500 est. value

Haverhill Street Clinic Buildings
New Construction, Infrastructure - 48,180 SF
Pending Verification
$1,000,000 CJ est. value
Andover, MA 01810

Pavement Surface
Infrastructure
Post-Bid
Ipswich, MA

Sidewalk and ADA Improvements at Various Locations
Results
$1,024,018 est. value

Last Updated 09/14/2022 03:04 PM
Project Title

RFQ Contractors - Downtown Municipal Complex Phase 1: Parking Lots 1 & 2 Connectivity (DMCC) Improvements

Physical Address View project details and contacts
City, State (County) Andover, MA 01810   (Essex County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $3,097,522 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Downtown Municipal Complex Connectivity, Phase 1, Parking Lots 1 and 2. Class of Work: Highway Construction. Additional Information Mass Dot Pre-qualification of Contractors With the Class of Work as Highway Construction for the Project With an Estimated Value of $3,097,522.15, Will Be Required. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The site consists of municipal lot #1 which is located behind Old Town Hall (20 Main Street) and bounded by Barnard Street, Bartlet Street and Park Street; municipal lot #2 which is located across the street at the corner of Bartlet and Park Street; and portions of Barnard Street, Bartlet Street, and Park Street; all of which are owned by the Town of Andover and available for public use.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents