Similar Projects
Robert Street Pedestrian-Bike Pathway - City of Cody
Infrastructure
Conception
$450,000 CJ est. value
Cody, WY 82414

Infrastructure Improvements - East Sheridan Intersects with Beacon Hill Road
Infrastructure
Conception
$1,250,000 CJ est. value
Cody, WY 82414

Construction of a Middle School Obstacle Course
Infrastructure
Design
Cody, WY 82414

RFQ - Yellowstone, Grand Teton and Surrounding Area MATOC, 2024-2028
Term Contract
Bidding
$150,000,000 CJ est. value
Yellowstone National Park, WY 82190

Hydrant Replacement and Corrosion Protection
Infrastructure
Post-Bid
$200,000 est. value
Cody, WY

New Student Center - Northwest College
Demolition, New Construction, Infrastructure
Post-Bid
$20,000,000 CJ est. value
Powell, WY 82435

Mammoth Lift Station Pumps - Yell
Term Contract
Results
Yellowstone National Park, WY 82190

Treated Water Transmission Lane
Renovation, Infrastructure
Results
$1,120,498 CJ est. value
Meeteetse, WY 82433

Rocky Mountain Granite
New Construction, Infrastructure - 5,000 SF
Pending Verification
$600,000 CJ est. value
Cody, WY 82414

Sweets Soda Shoppe
New Construction, Infrastructure - 502 SF
Pending Verification
$200,000 CJ est. value
Cody, WY 82414

Cody to Montana Wyoming 120 - 1502016 - Park County
Infrastructure
Conception
$2,863,000 CJ est. value
Cody, WY 82414

PCSD#1 FFA Barn
New Construction, Infrastructure - 6,131 SF
Post-Bid
$750,000 CJ est. value
Powell, WY 82435

Bromley Construction Dry Storage Building
New Construction, Infrastructure - 3,500 SF
Pending Verification
$378,000 CJ est. value
Cody, WY 82414

Willwood to Emblem Coon Creek Section / WY 32
Infrastructure
Conception
$2,864,000 CJ est. value
Powell, WY 82435

RFQ Contractor - Rehabilitate/Replace Canyon and Grant Village Wastewater Treatment Systems, Rehabilitate and Improve Old Faithful Water Treatment System
Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$90,000,000 CJ est. value
Yellowstone National Park, WY 82190

Last Updated 04/26/2023 05:31 PM
Project Title

North Seventh Street Circuit Bore

Physical Address View project details and contacts
City, State (County) Powell, WY 82435   (Park County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Carter Myers has invited you to a RingCentral Video meeting. Please join using this link: https://v.ringcentral.com/join/624344769pw=40c9f7d416385f86db582143c3023923 Meeting ID: 624344769 Password: 6usTFV2MGF One tap to join audio only from a smartphone: +16504191505,,624344769,,,6878382643, United States (San Mateo, CA) Or dial: +1 (650) 4191505 United States (San Mateo, CA) Access Code / Meeting ID: 624344769 Dial-in password: 6878382643 International numbers available: https://v.ringcentral.com/teleconference City of Powell reserves the right to reject any and/or all bids and to waive any informalities if deemed in the best interest of the Owner. No bid may be considered unless accompanied by the required bid guarantee of 5% of the total bid amount, which amount shall be forfeited if the bidder is awarded the Contract and fails to enter into a Contract with the Owner. Successful bidder will be required to provide payment and performance bonds in an amount of at least 100% of awarded contract price. MANDATORY PRE-BID CONFERENCE: 10:00A.M., April 20th , 2023 City Hall - 260 N Clark Street Powell, WY 82435 Question Deadline 04/06/2023 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents