Similar Projects
Culver Road Sanitary Sewer Extension Project
Infrastructure
Bidding
$220,000 CJ est. value
Tuscaloosa, AL 35401

Portable Storm Shelter
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Tuscaloosa, AL 35401

RFP Construction Manager - Medical/Psychiatric and Minimum-Security Dormitory addition
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Tuscaloosa, AL 35401

Take 5 Car Wash / Tuscaloosa
New Construction, Infrastructure - 3,963 SF
Post-Bid
$900,000 CJ est. value
Tuscaloosa, AL 35404

Clinical Services & Research MRI Addition - Early Foundation
Results
$950,000 est. value
Tuscaloosa, AL 35404

Maintenance Grounds Office Demolition
Demolition
Results
$172,200 est. value
Tuscaloosa, AL

Alamite Hotel
New Construction
Construction
$30,000,000 est. value
Tuscaloosa, AL 35404

Courtyard by Marriott
New Construction - 60,000 SF
Construction
$15,000,000 est. value
Northport, AL 35476

Peninsula Subdivision
New Construction, Infrastructure
Pending Verification
$3,910,000 CJ est. value
Tuscaloosa, AL 35406

Fit Foodz / Tuscaloosa
Addition, Renovation, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Tuscaloosa, AL 35401

Planing, Resurfacing, and Traffic Stripe on CR-84 (Charlie Shirley Road)
Infrastructure
Bidding
$1,437,070 CJ est. value
Northport, AL 35473

Northport Career Tech Annex Canopy Addition
Infrastructure
Post-Bid
$1,200,000 CJ est. value
Tuscaloosa, AL 35401

2021 Boring Services Project
Infrastructure
Results
Less than $50,000 est. value
Tuscaloosa, AL

The Ridge at Timber Cove
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Tuscaloosa, AL 35406

2022 Meter Change-Out Project, Phase 1
Infrastructure
Post-Bid
$300,000 CJ est. value
Tuscaloosa, AL 35401

Last Updated 09/08/2022 01:35 PM
Project Title

Element Hotel / Tuscaloosa

Physical Address View project details and contacts
City, State (County) Tuscaloosa, AL 35401   (Tuscaloosa County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $27,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The petition was presented to the Tuscaloosa Planning commission August 2022. Information regarding contractor has yet to be determined. Although a firm timeline has yet to be announced, construction is estimated to begin fourth quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

5 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents