Similar Projects
Freight Rail Facility Expansion
Conception
$13,224,090 to $26,500,000 est. value
Riviera Beach, FL

West Aventura Passenger Rail Station
New Construction
Design
Aventura, FL

Ultimate Urban Circulator Program Phase I: Bay Street Innovation Corridor - Two Step Process
Bidding
Jacksonville, FL

West Aventura Passenger Rail Station - Construction Services Consultant
Term Contract
Post-Bid
Miami, FL 33180

SEF Track Reconstruction - Package 2
Post-Bid
$2,500,000 to $5,000,000 est. value
Sebring, FL 33870

Jay-Jay Bridge Cross Tie Replacement and Rail System Repairs
Results
Merritt Island, FL 32952

Railroad Trestle Repairs
Results
Less than $360,000 est. value
Jacksonville, FL 32226

SCFE SE Extension Phase V - US 27 / CR 880 Signal Project
New Construction
Construction
Belle Glade, FL 33430

Rapid Mass Transit Solution for the North Corridor
Term Contract
Post-Bid
Miami, FL

Rapid Mass Transit Solution for the Beach Corridor Trunk Line
Results
Miami, FL 33128

Phase I and Phase II Track Rehabilitation Project
Post-Bid
Palmetto, FL 34221

Heavy Station Maintenance and Station Improvements
Results
Less than $2,625,093 est. value
Fort Lauderdale, Hollywood, West Palm Beach, FL 33407

Central Florida Rail Corridor(CFRC) - Capital Improvements - Multiple Locations
Term Contract
Post-Bid

Port Redwing Rail Extension Project
Results
$4,200,000 est. value
Tampa, FL 33600

Track And Switch Surfacing
Post-Bid
Hialeah, Sanford, FL

Last Updated 02/17/2020 02:53 PM
Project Title

Brightline - Phase II - West Palm Beach-Orlando Line

Physical Address View project details and contacts
City, State (County) Orlando, FL (Brevard, Indian River, Martin, Orange, Palm Beach, Saint Lucie Counties)
Category(s) Transportation
Sub-Category(s) Railroad/Subway
Contracting Method
Project Status Construction Commenced June 2019
Bids Due View project details and contacts
Estimated Value $1,500,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors for each Zone. Zone 1 is south of Orlando International Airport and includes the VMF site. Zone 2 is through the existing station and north 3 miles along Jeff Fuqua Blvd at the airport until SR 528. Zone 3 is a 35 mile stretch along SR 528 from the airport to Cocoa and Zone 4 is from Cocoa to West Palm Beach. Zone 1 VMF site: Hubbard Construction Co. Zone 1 VMF Building: Wharton-Smith Inc. Zone 2 GOAA alignment: The Middlesex Co. Zone 3 GOAA curve-Cocoa curve: Granite Construction Co. Zone 4 rail alignment Cocoa-WPB: HSR Constructors (Herzog, Stacy & Witbeck, Railworks) Zone 4 Loxahatchee Bascule Bridge reconstruction: Scott Bridge Co. To include: 200 miles of existing tracks from West Palm Beach to Cocoa. Addition of 40 miles of new tracks to Orlando. Possilbe future expansion with connections to Tampa and Jacksonville.

Details

1 Railroad/Subway, New Construction, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Roof and Deck Insulation.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Surfaces, Chalkboards, Tackboards, Signage, Compartments and Cubicles, Partitions, Fire Protection Specialties, Fire Extinguisher Cabinets, Fire Extinguishers, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 13 - Special Construction, Special Facility Components.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air-Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Fences and Gates, Planting Irrigation, Turf and Grasses, Plants.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents