Similar Projects
Roof Replacement at Margaret Brent Elementary School
Post-Bid
$510,000 est. value
Stafford, VA

Roof Replacement at Kate Waller Barrett Elementary School
Post-Bid
$416,600 est. value
Stafford, VA

Replace Roof on Old Town Hall
Results
Fairfax, VA

Kempsville High School Roof Replacement and Partial HVAC Replacement
Results
Virginia Beach, VA 23464

Lewis F. Powell Jr. U.S. Courthouse Exterior Envelope Renovation
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Richmond, VA 23219

A.S. Rhodes Elementary School Roof Replacement
Results
Front Royal, VA 22630

Restoration of EPDM Roof
Post-Bid
Clifton Forge, VA 24426

Roof Replacement Thomas Dale High School
Results
Less than $576,587 est. value
Chester, VA 23831

Civic Center Roof Replacement
Post-Bid
$500,000 est. value
Salem, VA 24153

Pentagon RDF Roof Repair - PHASE 2
Results
$10,000,000 to $25,000,000 est. value
Washington, DC - Arlington, VA 20301

Washington Liberty Roof Coating Restoration
Post-Bid
Arlington, VA 22201

M.M. Pierce ES Shingle Roof
Results
$111,672 est. value
Remington, VA

Pre-Qualification for Annaburg Manor Roof Replacement and Cornice Reconstruction
Post-Bid
Manassas, VA 20110

James Wood High School Athletic Roof Replacement
Results
$25,000 to $50,000 est. value
Winchester, VA 22603

Peter Muhlenberg Middle School and Ashby Lee Elementary School Roof Replacements
Post-Bid
$800,000 est. value
Quicksburg, Woodstock, VA 22847

Last Updated 11/19/2019 02:28 PM
Project Title

Grounds Building - Metal Roof Repairs

Physical Address View project details and contacts
City, State (County) Petersburg, VA 23805   (Petersburg City County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace approximately 60’ x 60’ metal roofing located on the low slope of roof area. 1.Remove existing metal roof system from the ridge cap down to eave, including water diverter, dispose into a legal landfill assumed not to contain any hazardous materials. 2.Inspect roof deck for sound surface to install new roof system. 3.Furnish and install high temperature ice and water shield over the synthetic underlayment over remainder of roof surface. a.Install new transition flashing between barn roof and lean- to addition and seal with water mastic under panels to make water tight using manufacturer’s current specifications. 4.Furnish and install new trim to include valleys ridge cap and flashing around chimneys for the complete roof system. 5.Provide contractors five (5) year workmanship warranty and manufacturers (20) twenty year finish warranty. 6.Clean up and dispose of all related debris generated from the project. Leave area and grounds broom clean.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents