Similar Projects
Wild Ricing Site Access Boardwalk
Infrastructure
Design
$500,000 CJ est. value
Cass Lake, MN 56633

Jasken Wetland Restoration
Infrastructure
Bidding
$300,000 CJ est. value
Waubun, MN 56589

Pine Island State Forest Flooding
Infrastructure
Bidding
$25,000 CJ est. value
Pine Island, MN 55963

Demolition for 1600 7th Street West
Demolition, Infrastructure
Sub-Bidding
$80,000 CJ est. value
Saint Paul, MN 55102

Lost Lake Road Graveling
Infrastructure
Sub-Bidding
$30,000 CJ est. value
Ada, MN 56510

Wayzata East MS 2021 Pool Ceiling Abatement
Post-Bid
Plymouth, MN 55441

Graffiti Abatement
Term Contract
Post-Bid
Minneapolis, MN

ATCC-21 Outdoor shooting Range Remediation
Results
$121,000 to $175,000 est. value
Alexandria, MN 56308

Esmond Building - Asbestos Abatement
Results
Duluth, MN 55806

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 Selective Demolition and Temporary
Renovation - 20,000 SF
Construction
$78,500 CJ est. value
Saint Paul, MN 55116

East Elementary Selective Demolition
Demolition, Infrastructure
Sub-Bidding
$70,000 CJ est. value
Raymond, MN 56282

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Asbestos Abatement at Midtowne Manor I
Alteration
Results
Duluth, MN 55806

Demolition, Removal , Dispose Buildings Arden Hills
Demolition, Infrastructure
Sub-Bidding
$40,000 CJ est. value
Arden Hills, MN 55112

Abatement & Demolition
Demolition, Infrastructure
Post-Bid
Austin, MN 55912

Last Updated 08/24/2022 10:31 PM
Project Title

Asbestos Removal of Apartments W-14. W-15, W-46, E-20, and E-22 at the LFHRA - Pine Grove Manor, Phase 10

Physical Address View project details and contacts
City, State (County) Little Falls, MN 56345   (Morrison County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $30,000 [brand] Estimate
Plans Available from Environmental Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Little Falls HRA - Pine Grove Manor (hereafter also referred to as "Owner") will receive sealed proposals for removal of asbestos from Apartments W-14, W-15, W-46, E-20, and E-22 at the Little Falls HRA (LFHRA) Pine Grove Manor located at 901 SW 1st Avenue, Little Falls, MN 56345 Bids will be considered by LFHRA-Pine Grove Manor Board of Directors on September 12, 2022. A bid tab will be prepared and emailed/mailed to all bidders on September 13, 2022. The project consists of removing asbestos floor tile and mastic, gypsum wallboard and taping/joint compound, and undercoated sinks. The asbestos is in five apartments. The kitchen counter/cabinets and upper cabinets are to be removed and disposed of. Bidders may withdraw their bids at any time prior to the time specified for opening. Negligence on the part of the Bidder in preparing their proposal confers no right for the withdrawal of the bid after it has been opened. After bids are opened, no bid can be withdrawn without the consent of the Owner. The Owner reserves the right to waive any irregularities and to reject any or all proposals or award upon such basis as they may deem to be in the Owner's best interest. No Bidder may withdraw his proposal within sixty (60) days after the date of the opening thereof.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents