Similar Projects
Reported | 03/13/2020 12:00 AM |
Project Title | Bayside Seawall Improvements |
Physical Address | View project details and contacts |
City, State (County) | Northport, ME 04849 (Waldo County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer - 02/21/20 until 03/10/20 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project consists of soil reinforcement, pinned granite blocks, rip rap, drainage, and site improvements to minimize erosion and to protect the park, causeway, wastewater system, and shoreline. The existing wood crib wall will be removed, and portions of the causeway will be re-built. Per the drawings and specifications, the work will run from the Ruggles Park boat ramp, through the existing wood crib wall, along the northern and southern sides of the causeway, and behind the chlorination building and wastewater tanks to the yacht club. Alternate portions of work include soil reinforcement and rip rap in front of and beyond the yacht club, soil reinforcement and pinned granite blocks north of the boat ramp, and drainage and rip rap at North Avenue. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |