Last Updated 12/15/2021 04:49 PM
Project Title

SFY 2021 Road Reconstruction Project Holly Avenue and West Essex Avenue (Harvest Avenue to Long Beach Boulevard)

Physical Address View project details and contacts
City, State (County) Harvey Cedars, NJ 08008   (Ocean County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project Involves Approximately 691 Tons Of Hot Mix Asphalt Top Course, 185 Tons of Hot Mix Asphalt Base Course, 740 SY 6-inch dense grade aggregate, three (3) Type "E" Frame and Grate, fourteen (14) Type A inlets, 1219 LF of 8-inch perforated Drainage Pipe in a stone trench and 71 LF of 12-inch drainage pipe, two (2) tide control valves, road restriping, concrete handicap ramps and all site restoration required.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents