Similar Projects
Upcoming: Ballistic Windows
Alteration
Design
San Jose, CA

Upcoming - Sleeve Valve
Term Contract, Alteration
Design
San Jose, CA

VISN 21 MACC - Renovate Building 7 Spinal Cord Injury Unit
Term Contract - 16,700 SF
Sub-Bidding
$5,000,000 CJ est. value
Palo Alto, CA 94304

Donaldson Inlet Filters and Drift Eliminators
Term Contract
Sub-Bidding
Santa Clara, CA 95050

Citywide as-Needed Repair Services
New Construction
Post-Bid
$10,000,000 CJ est. value
Santa Clara, CA

Site Maintenance Services
Alteration
Post-Bid
Less than $250,000 est. value
CA

General Building (B License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
New Construction, Renovation
Results
$5,000,000 est. value

Digester Cleaning and Equipment Services
Alteration
Results
San Jose, CA

MS4 Stormwater Management
Term Contract
Sub-Bidding
San Jose, CA 95113

Handyman Service
Alteration
Post-Bid

HVAC and Refrigeration System Repairs
Alteration
Results
$200,000 est. value
CA

Orchard Maintenance Services
Term Contract
Sub-Bidding
Cupertino, CA 95014

Parking Lot Steam Cleaning - Gilroy Cvef Northbound And Southbound
Term Contract
Post-Bid
San Martin, CA

Whole Structure Fumigation
Term Contract
Results

Tree Maintenance Services
Term Contract
Sub-Bidding
$200,000 CJ est. value
Cupertino, CA 95014

Last Updated 11/29/2022 01:02 PM
Project Title

On-Call Emergency and Critical Construction Services at RWQCP

Physical Address View project details and contacts
City, State (County) Palo Alto, CA 94301   (Santa Clara County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Question Deadline 12/02/2022 at 1:00 PM PT Online Q&A Yes The City Project Manager will establish the specific scope and work requirements at such time when the emergency or critical service is needed. In general, the scope of work may include but not be limited to the installation and/or repair of pipes, concrete walls, valves, slide/sluice gates, electrical systems, metal and concrete tanks, sumps, pumps, ducts, and typical wastewater equipment. The work may also involve the removal of hazardous materials. When the Contractors service is required, the City Project Manager will contact the Contractor and issue a work order. The City Project Manager and the Contractor shall mutually agree on the manpower and work requirements before the Contractor dispatches workers to the jobsite. The Contractor shall provide the appropriate services as requested by the City Project Manager. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $550 per day Start/Delivery Date March 15, 2023 Project Duration 5 years

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents