Similar Projects
Tanana River Recreation Access Improvement
Infrastructure
Design
$10,000,000 CJ est. value
Fairbanks, AK 99709

Tanana River Recreation Access Improvement
Infrastructure
Design
$10,000,000 CJ est. value
Fairbanks, AK 99709

Graehl Park Replacement
Infrastructure
Bidding
$750,000 CJ est. value
Fairbanks, AK 99701

Student Health and Counseling Center Renovations-Phase 1
Term Contract, Renovation, Infrastructure
Bidding
$1,000,000 CJ est. value
Fairbanks, AK 99709

Dalton Hwy MP 0-9 Reconstruction CMGC
Infrastructure
Post-Bid
$30,000,000 to $40,000,000 est. value
Fairbanks, AK

Steese/Johansen Interchange - Alaska Department of Transportation
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Fairbanks, AK 99701

Tanana Lakes Recreation Area Trailhead Kiosks
Infrastructure
Results
Fairbanks, AK 99701

Old Richardson Highway Intersection Improvements
Infrastructure
Results
AK

AK NPS KATM 10(4), Rehabilitate Valley of 10,000 Smokes Road, Phase IV
Infrastructure
Design
$2,000,000 CJ est. value
Fairbanks, AK 99701

Big Dipper Rinks 2 and 3 Asphalt Surfacing
Infrastructure
Bidding
$7,000,000 CJ est. value
Fairbanks, AK 99701

Airport Way/Cushman Street Intersection Reconstruction
Infrastructure
Results
$5,000,000 to $10,000,000 est. value
AK

354th Security Forces Squadron K9 Kennel Facility Repair
Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Eielson AFB, AK 99702

Resurface Old Seward Highway From Dimond Boulevard to Dowling Road
Infrastructure
Results
$2,500,000 to $5,000,000 est. value

Steese Expressway/Johansen Expressway Interchange CMGC
Infrastructure
Results
$30,000,000 to $40,000,000 est. value
AK

Reconstruct the Intersection of Airport Way, Steese Expressway, Gaffney Road, and the Richardson Highway
Infrastructure
Results
$20,000,000 to $30,000,000 est. value
AK

Last Updated 09/07/2022 12:32 PM
Project Title

RFP Engineering - FAI GA Apron and Taxiway Reconstruction

Physical Address View project details and contacts
City, State (County) Fairbanks, AK 99709   (Fairbanks North Star County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected May 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Professional engineering services for the FAI GA Apron & Taxiway Reconstruction project. Estimated range (US$): 500,000 to 1,000,000 Plans room: Northern Project Numbers-Program/Federal ......... : NFAPT00689 / TBA Project Site (City, Village, etc.)................ : Fairbanks, Alaska Project Title & Contract Description ........ : FAI GA Apron & Taxiway Reconstruction Anticipated period for performance-Begin/End: June 2022 through December 31, 2024 The method of contractor selection has not been determined at this time. AKDOT - RFP Engineering - FAI GA Apron and Taxiway Reconstruction *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents