Similar Projects
326 Shelden Avenue Mixed Use
New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Houghton, MI 49931

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Hot Mix Asphalt Base Crushing, Concrete Curb, Sidewalk and Ramps and Pavement Markings on 6th Street
Infrastructure
Bidding
$295,000 CJ est. value
Calumet, MI 49913

Maasto Hiihto Trail Repairs
Infrastructure
Post-Bid
$400,000 CJ est. value
Hancock, MI 49930

Maasto Hiihto Trail Repairs
Infrastructure
Post-Bid
$400,000 CJ est. value
Hancock, MI 49930

Water and Sewer System Improvements - MEDC-WRI Phase 4
Infrastructure
Results
$1,200,000 est. value
Houghton, MI

SDC Water Piping Replacement Phase II
Alteration
Results
Houghton, MI

Barkell Elementary School - 2022 Bond - Hancock Public Schools
Renovation, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Hancock, MI 49930

High School and Middle School - 2022 Bond - Hancock Public Schools
Renovation, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Hancock, MI 49930

Hot Mix Asphalt Base Crushing, Shaping and Resurfacing, Aggregate Shoulders, Slope Restoration and Pavement Markings on Atlantic Avenue
Infrastructure
Bidding
$513,000 CJ est. value
Portage charter Township, MI 49931

City of Hancock Business & Technology Park
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Hancock, MI 49930

Phase 3 Improvements - F.J. McLain State Park
Renovation, Infrastructure
Results
$320,000 est. value
Hancock, MI 49930

Sturgeon River Sloughs Bridge
Demolition, New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Portage charter Township, MI 49931

Rice Memorial Center Exterior Ramp Replacement
Infrastructure, Renovation
Post-Bid
$200,000 CJ est. value
Houghton, MI 49931

Dollar Bay to Lake Linden Trail Bid Package #3
Infrastructure
Results
$1,375,368 CJ est. value
Lake Linden, MI 49945

Last Updated 02/27/2023 03:07 PM
Project Title

Tech Trails Water and Sewer

Physical Address View project details and contacts
City, State (County) Houghton, MI 49931   (Houghton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $239,615 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 27, 2023, the project has been awarded. A timeline for construction has not been confirmed. The installation of new underground utilities to future trailhead lodge and to the existing Tech Trails Waxing Center. Sanitary Sewer (Gravity), Directional Bore, Trenchless Utility Construction, Construction, Sewer and Water Construction, Sitework/Excavating and Grading, Grade and Surface, Grubbing & Clearing, Waterlines Est. Completion Date: Aug. 18, 2023 Pre-Qualification: Yes Please contact Project Manager Travis Aho, traho@mtu.edu, 906-487-2904 if you have technical questions. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents