Similar Projects
Sidewalk Improvements Program
Post-Bid
Port Chester, NY 10573

Reconstruction of the Rye Town Park Beach Ramps
Post-Bid
Rye, NY 10580

Beekman Avenue Pedestrian Improvements - PIN Nos. 8761.15 and 8761.50
Results
Sleepy Hollow, NY 10591

Purdy`s Train Station Pedestrian Improvements
Results
Less than $581,000 est. value
North Salem, NY 10560

Central 5 Parking Lot ADA Asphalt
Post-Bid
Harrison, NY 10577

2020 Sidewalk and Curb Replacement
Results
Eastchester, Tuckahoe, NY

Babbitt Road Sidewalk Improvements
Post-Bid
Bedford Hills, NY 10507

Construction of Asphalt Driveway Aprons, Sidewalks, Curbs and Spoon Ditches
Term Contract
Results
Bedford Hills, NY 10507

Removal and Construction of Sidewalks, Concrete Curbs, etc.
Alteration
Post-Bid
Buchanan, NY

Sidewalk and Curb Improvements
Term Contract
Results
Pleasantville, NY 10570

Construction of Concrete Sidewalks
Alteration
Post-Bid
Bedford, NY

Old Tarrytown Road and Manhattan Avenue Sidewalk Improvements
Results
Greenburgh, NY 10607

2021 Sidewalk and Curb Replacement Project
Alteration
Post-Bid
Eastchester, NY

Y1lz--620-18-202 Expand Parking Lot 620-18-202 Expand Parking Lot
Results
$500,000 to $1,000,000 est. value
Montrose, NY

Sidewalk Improvements at Various Locations
Infrastructure
Post-Bid
New Rochelle, NY

Last Updated 01/06/2022 12:10 PM
Project Title

North Central Park Avenue and Lawton Avenue Pedestrian Improvements-2021

Physical Address View project details and contacts
City, State (County) Greenburgh, NY   (Westchester County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the installation of two sidewalk bump-outs, a High-Intensity Crosswalk (HAWK) traffic control system, pavement markings including a new crosswalk, installation of a new catch basin and associated storm sewer connection, and all associated work at the intersection of North Central Park Avenue and Lawton Avenue in the Town of Greenburgh.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents