Similar Projects
Williams Road UD/Street/Streetscape and Median Island - 9071 - City of Salinas
Infrastructure
Conception
$7,513,800 CJ est. value
Salinas, CA 93905

Williams Road UD/Street/Streetscape and Median Island - 9071 - City of Salinas
Infrastructure
Conception
$7,513,800 CJ est. value
Salinas, CA 93905

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

The Park Lane
New Construction, Infrastructure
Design
$16,500,000 CJ est. value
Monterey, CA 93940

Cold Plane, Place HMA and RHMA and Shoulder Widening
Infrastructure
Bidding
$2,400,000 CJ est. value
Monterey, CA 93940

Cold Plane, Place HMA and RHMA and Shoulder Widening
Infrastructure
Bidding
$2,400,000 CJ est. value
Monterey, CA 93940

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Place Polymer Modified Emulsion Chip Seal Coat on Existing Roadbed
Infrastructure
Post-Bid
$670,000 est. value

Construct Retaining Wall, Widening Shoulder and Place HMA
Infrastructure
Results
$1,490,000 est. value
CA

Sacramento Street Road Diet and Rehabilitation Project
Infrastructure
Results
$715,000 est. value
Salinas, Vallejo, CA 94590

Hotel Durell / Pacific Grove
New Construction, Infrastructure - 68,400 SF
Pending Verification
$12,000,000 CJ est. value
Pacific Grove, CA 93950

Hotel Durell / Pacific Grove
New Construction, Infrastructure - 68,400 SF
Pending Verification
$12,000,000 CJ est. value
Pacific Grove, CA 93950

West Laurel Drive Improvements - 9145 - City of Salinas
Infrastructure
Conception
$150,000 CJ est. value
Salinas, CA 93906

America's Tire / Seaside
New Construction, Infrastructure - 11,191 SF
Design
$3,000,000 CJ est. value
Seaside, CA 93955

RFP Construction Manager - SURF! Busway and Bus Rapid Transit Project
Infrastructure
Bidding
$11,000,000 CJ est. value
Marina, CA 93933

Last Updated 09/12/2022 04:10 PM
Project Title

California Avenue Pedestrian Crossing Installation

Physical Address View project details and contacts
City, State (County) Marina, CA 93933   (Monterey County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The California Avenue Pedestrian Crossing Installation project is located at the intersection of California Avenue and Marina Heights Drive in Marina, California. This project includes installation of two new ADA compliant curb ramps and a pedestrian crosswalk with a Pedestrian Hybrid Beacon (PBH) and associated electrical system at the southside of the intersection. In addition, work will require conform curb, gutter, and sidewalk, asphalt concrete pavement, fog sealing, pavement markings and striping and associated miscellaneous work for a complete and operational pedestrian crossing in accordance with bidding documents. Time for Completion - All work under this contract shall be completed before the expiration one hundred twenty (120) working days from the date of the first Notice To Proceed. The first Notice to Proceed will be issued for material procurement and another Notice to Proceed will be issued for construction once the materials are on site. Contractor shall submit to the City copy of material billing and expected delivery of material. No field construction is allowed until materials are delivered on the site or unless approved by the City. At the time of the bid opening, the successful Bidder must be legally entitled to perform contracts requiring a Class A General Contractor's license. Any Bidder or contractor not so licensed shall be subject to all penalties imposed by law including, but not limited to, any appropriate disciplinary action by the Contractors' State License Board. For more information, please email email Michaelle Mowery, mmowery@cityofmarina.org or Elvie Camacho. mailto:elviec@wallacegroup.us

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents