Reported | 12/30/2021 12:00 AM |
Project Title | Demolition of Metro Extended Stay Building at 652 Buford Drive Project |
Physical Address | View project details and contacts |
City, State (County) | GA 30046 (Gwinnett County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Demolition |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work to be performed by the Contractor consists of but is not limited to the following major items: All improvements must be completely demolished and removed from their present site. All the building structures as per drawings including floor slabs, concrete paving, footings, basement/crawlspace walls, retaining walls, debris, junk and trash removal, trees, tree roots and shrubs The demo includes also all islands, curb and gutters, canopies, signs, and septic tanks if any. All asphalt paving, to remain undisturbed or as directed by the Project Engineer. All demolition debris must be removed and disposed of properly in an appropriate landfill or recycled in accordance with the provisions of the Georgia Comprehensive Solid Waste Management Act of 1990 and the Georgia Rules for Solid Waste Management Chapter 391- 3-4. Backfill disturbed areas with good dirt compacted to min 95%. The end result of the demolition areas needs to be that the area has a smooth flat slope and drains well, and hydro seed with permanent seeding. Erosion control shall be installed as per the drawings or where necessary or as directed by the Project Engineer. Including installation of the orange fence (tree save areas) as per the drawings. Basements/crawlspaces if any must be graded, filled, and sloped in such a manner that the site does not retain water and is acceptable to the Engineer. Driveways to remain shall be cut at the R.O.W line or as indicated on the drawings. All concrete pools, pool decks, pool liners, steel tallies, staircases, or any other pool components (if any), shall be completely removed before filling with clean soil and must be filled to the ground line or grade and sloped in such a manner that the site does not retain any stormwater. All existing lateral sewer lines not in use shall be demolished and plugged at the property line or the manhole at the lower side of the property line. All sewer connections shall be covered with wire mesh and filled with cement completely sealing off all sewer at the R.O.W. or property line. All storm structures as shown on the drawings shall remain undisturbed and clean from any debris during and after the project is completed. All earthwork operations shall comply with requirements of OSHA construction standards, part 1925, subpart “P”, excavations, trenching and shoring, and subpart “O”, motor vehicles, mechanized and equipment, and marine operations, and shall be conducted in a manner acceptable to Engineer. Fill materials shall be spread evenly in horizontal layers, compacted, and shall be smoothed out. The contractor shall thoroughly familiarize himself with all existing site conditions by site visitation, detailed review of all current site plans, previous information or surrounding land uses, and zoning conditions or other materials to fully ascertain the scope of the work implied within the plans. The contractor is responsible for all earth quantities, grading operations, and miscellaneous hauling and/or disposal operations to render the site to the final contour and grade elevations shown on the plan. Fill required shall be furnished, installed, and compacted as part of the contractor’s base bid. If “excess” cut is generated from the approved area of the City of Lawrenceville’s property or hauled off-site at no additional cost to the City of Lawrenceville. The contractor shall limit construction operations to the project site and within the limits of the easements shown and shall protect adjacent properties and property City of Lawrenceville from encroachment by soil erosion. Erosion control shall be installed where necessary or as directed by the Engineer. The contractor shall call in for utility locates before any construction work. The removal of abatement of asbestos shall be in a manner that meets all Federal and State requirements, and disposal of at a facility approved by the Georgia Department of Natural Resources. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |