Similar Projects
Tuscan Neighborhood Park - WCE901 - City of Elk Grove
Infrastructure
Conception
$5,383,000 CJ est. value
Elk Grove, CA 95624

Folsom Plan Area Fire Station #34 - City of Folsom
New Construction, Infrastructure
Conception
$10,800,000 CJ est. value
Folsom, CA 95630

Phan Apartment Homes At Sierra Vista Park
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Sacramento, CA 95823

Valley Rail Project / Altamont Corridor Express- San Joaquin Joint Power Authority
Infrastructure
Design
$404,000,000 CJ est. value
Sacramento, CA 95814

Northpointe K-5 Dual Immersion School
New Construction
Post-Bid
Sacramento, CA 95834

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Folsom Boulevard Complete Streets Phase 1
Infrastructure
Results
$5,400,000 est. value
Sacramento, CA

Hot Mix Asphalt (HMA) Concrete Grinder Dig Out Repair and Replacement Paving
Infrastructure
Results
CA

3S Apartments
Demolition, New Construction, Infrastructure - 2,300 SF
Construction
$71,500,000 CJ est. value
Sacramento, CA 95811

Sunrise Mall Redevelopment
New Construction, Infrastructure - 695,000 SF
Pending Verification
$400,000,000 CJ est. value
Citrus Heights, CA 95610

Ice Box
New Construction, Infrastructure - 79,190 SF
Pending Verification
$25,000,000 CJ est. value
Sacramento, CA 95811

Laguna Boulevard Right Turn Lane to West Stockton Boulevard - WTR058 - City of Elk Grove
Infrastructure
Conception
Elk Grove, CA 95758

Victory Avenue Apartment / Flemings Highway Farms
New Construction, Infrastructure
Design
$28,000,000 CJ est. value
Sacramento, CA 95828

Cold Plane AC Pavement, Place HMA and Replace Concrete Slabs
Infrastructure, Alteration
Post-Bid
$4,860,000 est. value
CA

Power Inn Road Improvement Project
Infrastructure
Results
$3,208,000 est. value
Sacramento, CA 95811

Last Updated 03/07/2023 05:46 PM
Project Title

CVES & TJES Site Improvements LLB

Physical Address View project details and contacts
City, State (County) Folsom, CA 95630   (Sacramento County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Request for Proposals (RFPs), Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

Page1of11REQUEST FOR PROPOSALS ("RFP")Construction Services for Lease-Leaseback Project DeliverySite ImprovementsforPermanentModular BuildingsCordova Villa Elementary School and Theodore Judah Elementary SchoolFolsom Cordova Unified SchoolDistrictResponses must be received onFebruary28, 2023, no later than2 p.m.Folsom Cordova UnifiedSchool District ("District") invites proposals from firms, partnerships,corporations, associations, persons, or professional organizations to enter into a Lease-Leasebackagreement with the District to construct improvements and perform a project as moreparticularlydescribed inExhibit "A"("Project") pursuant to Education Code section 17406et seq.The Projectis anticipated to beapproved by the DSAon February 17, 2023, and thus there will beno preconstruction services needed for this Project. TheDistrict is requesting that contractorsreview the deadlines and plans and specifications provided with this RFP and provide priceproposals. The District will use the price proposals to develop a contract for completion of theProject within the time frames stated inExhibit A.Questions regarding this Request for Proposals (“RFP”) must be directed to the District’s ChiefOperations Officer at the email address below.Interested firms or persons must submit theirproposals, which shall not exceedtwenty-five(25) single sided pages, as described below, withone (1) electronic copy, andthree(3)hardcopies of requested materials to:Folsom Cordova Unified School DistrictMatt Washburn, Chief Operations Officermwashburn@fcusd.org1965 Birkmont Drive, Rancho Cordova, CA 95742

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents