Similar Projects
Patterson Road Sidewalk
Infrastructure
Conception
$250,000 CJ est. value
Columbia, SC 29209

US 76 over US 601
Demolition, New Construction, Infrastructure
Conception
$9,648,000 CJ est. value
Columbia, SC 29205

Shady Lane Force Main Replacement (SS7548) CDBE - Part 1
Infrastructure
Design
$661,770 CJ est. value
Columbia, SC 29206

Sidewalk Package S11 Polo Road and Harrison Road Sidewalks
Infrastructure
Design
$4,672,637 CJ est. value
Columbia, SC 29206

Blythewood Road Widening Project
Infrastructure
Bidding
$500,000 CJ est. value
Columbia, SC 29201

Evidence Building Barnwell Lot
Infrastructure
Bidding
$200,000 CJ est. value
Columbia, SC 29201

Jackson Creek Site Restoration Project
Infrastructure
Post-Bid
Columbia, SC 29206

City of Columbia Olympia Fire Station Replacement
Demolition, New Construction, Infrastructure
Post-Bid
$7,000,000 CJ est. value
Columbia, SC 29201

Turnkey Chemical Site Preparation at Mcbee WMA (Skidder Application)
Infrastructure
Results
Columbia, SC

Bitternut Pump Station Improvements (WM4574) CDBE - Phase II
Renovation, Infrastructure
Results
$833,948 CJ est. value
Columbia, SC 29209

Clutch Coffee / Columbia
New Construction, Infrastructure - 798 SF
Construction
$250,000 CJ est. value
Columbia, SC 29209

Finlay Park Development
Infrastructure
Pending Verification
$10,000,000 CJ est. value
Columbia, SC 29201

Metro Waste Water Treatment Plant Solar Photovoltaic Power Generation System
Renovation
Pending Verification
Columbia, SC 29201

US 76 Safety Improvements in Richland County
Infrastructure
Conception
$10,204,000 CJ est. value
Columbia, SC 29205

The Ball Park Mixed-Use
New Construction, Infrastructure - 20,000 SF
Design
$30,000,000 CJ est. value
Columbia, SC 29201

Last Updated 12/07/2022 11:55 AM
Project Title

Metro Wastewater Treatment Plant Flow Metering Improvements CDBE - Part 1

Physical Address View project details and contacts
City, State (County) Columbia, SC 29201   (Richland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected January 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of 7/26/2022, owner has determined the CDBE Compliant Bidders.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents