Similar Projects
SFB Multiple HVAC Project
Alteration
Bidding
Buckeye, AZ 85326

Tucson Magnet High School Air Handler Replacement Project
Alteration
Bidding
Tucson, AZ

WAPA DSW HVAC Controls
Post-Bid
Phoenix, AZ 85005

Cooling Tower Replacement
Post-Bid
Goodyear, AZ 85395

Boiler Inspection Services
Results
Phoenix, AZ

Franklin at Brimhall Chiller Controls and Plant Controls Upgrade
Results
Mesa, AZ 85206

LDS Encanto Meeting House -- HVAC
Renovation
Construction
$450,000 est. value
Phoenix, AZ 85035

HVAC Replacement Project
Alteration
Bidding
Tucson, AZ 85706

J043--644 - Annual Chiller, Condensers, & Evaporator Testing
Post-Bid
Phoenix, AZ 85012

Shepherd Junior High Chiller Controls and Plant Controls Upgrade
Results
Mesa, AZ 85205

West Courts Hot Water Boilers Replacement
Term Contract
Bidding
Phoenix, AZ 85003

HVAC System Coil and Air Handler Cleaning
Term Contract
Post-Bid
Phoenix, AZ 85003

Red Mountain Ranch Elementary Cooling Tower Repairs
Term Contract
Results
Mesa, AZ 85215

Roof Repair and HVAC Project at Pierson High School Gym
Alteration
Bidding
Nogales, AZ 85621

HVAC Conversion at Solomon Elementary School
Post-Bid
Solomon, AZ 85551

Last Updated 10/13/2021 04:11 PM
Project Title

Universal Air HVAC Jeehdeez`a Elem School

Physical Address View project details and contacts
City, State (County) Pinon, AZ   (Navajo County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100% Indian Small Business Economic Enterprise (ISBEE) Set-Aside. The contractor will be hired to perform services on HVAC Air Duct Systems at the Jeehdeez'a Elementary School, 3 Miles East of Navajo Route 60, Pinon , Arizona 86510. l . Contractor shall open all air duct systems. 2.Contractor shall clean duct systems with roto brush duct cleaner. 3.Contractor shall use fog systems with mold/mildew and bacterial cleaners. 4.Contractor shall service HVAC Units by cleaning units and coils. 5.Contractor shall properly close all HVAC Units when the project is completed.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents