Similar Projects
Streambank Repairs
Bidding
Raleigh, NC 27604

Raleigh Green Stormwater Infrastructure Retrofits
Bidding
Less than $600,000 est. value
Raleigh, NC 27602

Ramblewood Drainage Improvements Project
Post-Bid
Raleigh, NC

Dorothea Drive Drainage Improvements (Formal)
Post-Bid
Raleigh, NC

Pullen Park Culvert (PC1) Wing Wall Repair
Results
Raleigh, NC

Large Diameter Pipe, Fittings and Valves
Results
Raleigh, NC

Kelly Point Ct Drainage Improvements
Bidding
Less than $100,000 est. value
Apex, NC 27502

South Mayo River Flood Reduction Project Rehabilitation
Post-Bid
$500,000 to $1,000,000 est. value

Pond Maintenance Services NC Museum of Art
Results
Raleigh, NC

Stormwater Drainage Assistance Program - Bundle Project #1
Post-Bid
Raleigh, NC 27604

High Density Polyethylene (HDPE) Pipe and Accessories
Results
Raleigh, NC

Stormwater Drainage Assistance Program
Post-Bid
Raleigh, NC 27610

Slope Repair and Rock Plating on NC-540 in Wake County
Term Contract
Results
NC

Two Creeks at Planetree Drainage Improvement Project
Post-Bid
Cary, NC

Ailey Young Dam and Stream Restoration
Results
Less than $475,275 est. value
Wake Forest, NC

Reported 05/02/2019 12:00 AM
Project Title

North Ridge Drainage System Improvements and Stream Stabilization Project Phase IV and V

Physical Address View project details and contacts
City, State (County) Raleigh, NC   (Wake County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The work will generally consist of clearing, grading, storm and sewer pipe and structure removal, concrete box culvert, RCP, and sanitary sewer installation, drainage inlet structure, endwall, headwall, and manhole installation, outlet stabilization, utility relocations and adjustments, curb and gutter, paving, traffic control, erosion and sediment control and other related items as shown on the plans, in the contract specifications, and/or as directed by the Engineer. The Contractor shall also be responsible for the installation of soil erosion and sediment control devices, rip rap; related earth excavation; fill, borrow, landscaping, topsoil and seedbed material; and storing and stockpiling material.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents