Similar Projects
Rocky Creek Sewer Lines and the Riverside Basin Sewer Project - Macon Water Authorit
Infrastructure
Conception
$28,000,000 CJ est. value
Macon, GA 31201

SR 11 Fm 0.16 Mi S of Woodlawn Dr / Bibb to 0.02 Mi S of SR 22
Infrastructure, Alteration
Design
$6,000,000 est. value
Macon, GA 31206

SR 49 From SR 11 to Jones County Line
Infrastructure
Design
$1,000,000 CJ est. value
Macon, GA 31216

Construction of a Roundabout on US 41/SR 247
Infrastructure
Bidding
$5,269,044 CJ est. value
Macon, GA 31204

I-Hop / Macon
New Construction, Infrastructure
Bidding
Macon, GA 31201

IRS - Relocation And Renovation
Renovation
Post-Bid
Macon, GA 31201

Max Fitness / Macon
New Construction, Infrastructure - 40,703 SF
Post-Bid
$12,000,000 CJ est. value
Macon, GA 31210

Site Repair Thompson Stadium
Results
Macon, GA

Construction of Cotton Avenue Plaza
New Construction, Infrastructure
Results
$667,080 CJ est. value
Macon, GA 31201

Piedmont Capital Management
New Construction
Pending Verification
Macon, GA

Irving Tissue a/k/a Project Tiger2 - Phase II
New Construction
Pending Verification
$400,000,000 est. value
Macon, GA 31216

Bethel Church Road Convenience Store with Fuel Pumps
New Construction, Infrastructure - 6,900 SF
Design
$1,500,000 CJ est. value
Lizella, GA 31052

Softball Press Box/Concession Stand
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Macon, GA 31210

Renovation Services for the Purpose of Expanding its Current Dispatch Office
Renovation
Post-Bid
Macon, GA 31201

Forsyth Street Convenience Store and Gas Station
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Macon, GA 31201

Last Updated 08/22/2022 01:02 PM
Project Title

Project Titan

Physical Address View project details and contacts
City, State (County) Macon, GA 31216   (Bibb County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $45,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 1-story, 365,500 square foot residential windows and sliding doors production and distribution facility with an attached 1-story, 12,400 square foot office building. As of August 22, 2022, this project is seeking approval from the Macon-Bibb County Planning and Zoning Commission. A firm timeline has not been confirmed.

Details

,, 385,504 SF - 1 Story Above Grade, 12,400 SF. 1 Story Above Grade, 365,500 SF. 7,604 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents