Similar Projects
State Route (SR) 400 Express Lanes P3 Project
Infrastructure
Bidding

Brannon Road Sidewalk
Infrastructure
Bidding
Cumming, GA 30041

SR 400 Express Lanes
Post-Bid
Less than $13,000,000 est. value

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Southern Region Disaster Recovery Support BPA
Results

Buford Dam Road Extension
Results
Less than $3,800,000 est. value
Cumming, GA 30041

Landscaping at Roundabout on Union Hill/Mcfarland
Infrastructure
Post-Bid
Alpharetta, GA 30004

North Point Parkway LID Streetscape Enhancement and Upgrade
Results
Alpharetta, GA

Landscape Maintenance on State Right of Way/Medians
Infrastructure
Post-Bid
Cumming, GA

FY21 Milling and Resurfacing and Pavement Preservation
Results
Alpharetta, GA

T32-D1-Veg Rem-SR 400 Forsyth-124291
Infrastructure
Post-Bid
GA

Resurfacing And Installation Of Truck Apron At Shady Grove Campground
Results
Cumming, GA 30041

Greenway Maintenance as Needed
Infrastructure
Post-Bid
GA

Pilgrim Mill Road Multi-Use Trail Design/Environmental Services
Results
Less than $3,500,000 est. value
Cumming, GA

Sawnee Drive Connector Road
Infrastructure
Post-Bid
Cumming, GA 30040

Reported 04/23/2022 12:00 AM
Project Title

Burger King

Physical Address View project details and contacts
City, State (County) Cumming, GA 30040   (Forsyth County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping, Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Bids by Invitation.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Items in ROW - By GDOT •New sidewalk •New catch basin •New storm water pipe •New curb and gutter - left and right side of apron. Items in Temporary Easement - By Owner •Existing light pole left side of parcel undisturbed •Proposed new landscaping to replace shrubs left and right side of apron •Proposed saw cut and demolish existing curb / asphalt pavement right side of apron •New apron. Items on our Parcel - By Owner •Proposed new back flow preventer •Relocate water meter •Proposed saw cut and demolish curb line on left island and existing grassed area to install new asphalt pavement •Proposed new curb and gutter on left island •Adjust manhole top on new asphalt •Proposed relocate light pole right side of parcel to outside of temporary easement

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents