Similar Projects
South Clark Street Bridge Over Blackhawk Creek - FP004 - City of Davenport
Infrastructure
Conception
$770,000 est. value
Davenport, IA 52805

Eastern Avenue Bridge at Goose Creek - FP005 - City of Davenport
Renovation, Infrastructure
Conception
$440,000 est. value
Davenport, IA 52805

Youth Justice & Rehabilitation Center
New Construction, Infrastructure - 64,000 SF
Bidding
Davenport, IA 52807

Youth Justice & Rehabilitation Center
New Construction, Infrastructure - 64,000 SF
Bidding
Davenport, IA 52807

All Inclusive Swing at Vander Veer Park
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Davenport, IA 52803

Hillandale Road and North West Boulevard, 76th Street and North West Boulevard
Infrastructure
Post-Bid
Davenport, IA 52805

PCC Patching
Infrastructure
Post-Bid
IA

Indiana Avenue Friction Seal
Infrastructure
Results
Bettendorf, IA

23rd Street Reconstruction
Infrastructure
Results
Bettendorf, IA

Bettendorf Road Repairs For 18Th Street
New Construction, Alteration
Pending Verification
Bettendorf, IA 52722

Middle Road Pedestrian Bridge - City of Bettendorf
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Bettendorf, IA 52722

Ballfield Complex Parking - FP078 - City of Davenport
Infrastructure
Conception
$150,000 est. value
Davenport, IA 52807

Duck Creek Golf Cart Paths 2022
Infrastructure
Bidding
Davenport, IA 52803

Pleasant View ES 2022 Access Drive Improvements
Infrastructure
Post-Bid
Bettendorf, IA 52722

Marquette and West 12th Street Replacement
Infrastructure
Results
Davenport, IA

Last Updated 08/10/2022 08:47 AM
Project Title

Pedestrian Curb Ramp Retrofit Program

Physical Address View project details and contacts
City, State (County) Davenport, IA 52801   (Scott County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $366,879 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Pedestrian Curb Ramp Retrofit Prices in bid should be free of all sales taxes. Pursuant to Iowa Code sections 422.42 (15) & (16), the awarded contractor will be issued a tax exemption certificate to purchase construction materials (within the state of Iowa) that will be incorporated into real property for this project tax free. For all bids over $100,000, the City of Davenport requires a Bid Bond of 5% of the bid amount. A copy of the front page of the bid bond must be attached in the "Response Attachments" tab of the bid package. Bids over $100,000, submitted without a bid bond will not be considered. For awarded bids over $100,000, the awarded contractor will be required to furnish a Performance Bond in an amount equal to one hundred percent (100%) of the Contract amount, and said bond to be issued by a responsible surety approved by the City and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained. Working Days - All work, including final cleanup and removal of all equipment for the bid project shall be completed before November 30, 2022. Liquidated Damages - Liquidated damages shall be $200 per day. Attention is called to the fact that the contractor must ensure that employees and applicants for employment are not discriminated against because of race, color, creed, religion, sex, gender identity or expression, national origin or ancestry, sexual orientation, age, marital status, familial status, physical or mental disabilities or political beliefs and affiliations. The City reserves the right to reject any or all bids and to waive technicalities and irregularities, if it is deemed in the public interest to do so. completed before November 30, 2022 Scope of Work and Scheduling Work will consist of the retrofitting of ADA pedestrian curb ramps in conjunction with the Street Maintenance Division's neighborhood street resurfacing program. Work will include removing sections of sidewalks, curb and gutter, driveway approaches, and other surfaces as required to facilitate the installation of ADA pedestrian ramps and detectable warning panels.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents