Similar Projects
Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$1,114,000 est. value
Harrold, SD

Modify Intersection, PCC Surfacing
Alteration
Conception
$3,600,000 est. value
Harrold, SD 57536

Sutherland Building Parking Lot Replacement
Infrastructure
Bidding
$300,000 CJ est. value
Pierre, SD 57501

Sutherland Building Parking Lot Replacement
Infrastructure
Bidding
$300,000 CJ est. value
Pierre, SD 57501

South Dakota State Penitentiary - Campus Wide Pavement Maintenance Phase 2
Infrastructure
Post-Bid
Pierre, SD

Oahe Dam Project - IDCC for Minor Construction for the Rehabilitation of Roads and Grounds
Alteration
Post-Bid
$2,500,000 est. value
Pierre, SD 57501

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

B Street Improvements
Results
$517,366 est. value
Pierre, SD

Urban Grading, Curb and Gutter, ADA, Signals, Storm Sewer, Lighting, AC Surfacing
Alteration
Conception
$12,766,000 est. value
Harrold, SD 57536

2022 SDDOT Airport Pavement Maintenance
Term Contract, Infrastructure
Post-Bid
SD

Airport Road Reconstruction 2021
Infrastructure
Results
$2,498,526 est. value
Pierre, SD

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Outdoor Pool Earthwork
Infrastructure
Results
$1,114,745 est. value
Pierre, SD

Course Base Gravel Surfacing, Cheyenne Lake Use Area Mobley
Infrastructure
Post-Bid
Pierre, SD

Access Road Construction
Infrastructure
Results
SD

Last Updated 07/29/2022 10:08 AM
Project Title

Steamboat Park Development - City of Pierre

Physical Address View project details and contacts
City, State (County) Pierre, SD 57501   (Hughes County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Redevelopment for the western portion of Steamboat Park. As of July 29, 2022, this project conceptual. An engineer has been selected to develop a Master Plan.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents