Similar Projects
Minong - Solon Springs Const / Concrete / Joint Repair
Infrastructure
Conception
$2,000,000 CJ est. value
Trego, WI 54888

Minong - Solon Springs Const / Concrete / Joint Repair
Infrastructure
Conception
$2,000,000 CJ est. value
Trego, WI 54888

Spooner - Stone Lake Construction / Bridge New
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Spooner, WI 54801

Spooner - Stone Lake Construction / Bridge New
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Spooner, WI 54801

Minong Ranger Station Replacement- MEP
New Construction, Infrastructure
Bidding
$2,368,300 CJ est. value
Minong, WI 54859

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Excavation and Grading of Kilkare Road
Infrastructure
Post-Bid
$100,000 est. value
Spooner, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Spooner - Stone Lake, Crystal Brook Bridge, B-65-0060; Spooner - Stone Lake, USH 53 to South Junction CTH M
Infrastructure
Results
Spooner, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Minong Ranger Station Replacement - GPC
New Construction, Infrastructure
Pending Verification
$2,927,800 CJ est. value
Minong, WI 54859

New Auburn - Spooner Construction / Pavement Replacement
Infrastructure
Conception
$25,000,000 CJ est. value
Trego, WI 54888

Washburn County E-Building Project
New Construction, Infrastructure - 4,000 SF
Post-Bid
$250,000 CJ est. value
Spooner, WI 54801

Spooner - Hayward, Greenwood Avenue to Poplar Street; Spooner - Hayward, Greenwood Avenue to Poplar Street
Infrastructure
Results
WI

Last Updated 11/30/2022 09:36 AM
Project Title

Spooner - STH 77; CTH F to STH 77

Physical Address View project details and contacts
City, State (County) Trego, WI 54888   (Washburn County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,344,928 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Spooner - STH 77, CTH F to STH 77; Washburn County; 8800-00-71, WISC 2023 079; CTH K; 2.673 Miles; Base, HMA Pavement, and Pavement Marking. DBE Goal: 3 % Estimated Range $1,000,000 - $1,999,999 With each sealed proposal, the bidder must include a properly executed bid bond or a cashier's check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. Contractors should submit all questions concerning plans and/or proposals through Website. This process is documented and can be found at Website. WisDOT - 055 - Spooner - STH 77, CTH F to STH 77 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents