Similar Projects
Last Updated | 07/25/2023 02:08 PM |
Project Title | Riverside Elementary School 2023 Classrooms & Board Office Addition |
Physical Address | View project details and contacts |
City, State (County) | Riverside, NJ 08075 (Burlington County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Elementary School, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $6,526,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project includes demolition of the existing 1-story Board Office, adjacent playground area and related site work in preparation for the new construction. The demolition work also includes the removal of Category I non-friable asbestos-containing roofing materials on the Board of Education Building Section (See the Asbestos Abatement Specification by for the Specific Scope of Work). This phase shall be completed on or before August 18, 2023. Question Deadline May 16, 2023 at 5:00 PM Construction of a 2-story approximately 16,000 SF load bearing masonry and steel building housing ten (10) classrooms with toilet rooms, small group instruction room, Board Offices and a staircase. Renovation of existing nurse's suite and adjacent areas to the construction. Renovation of existing nurse's suite and adjacent areas to the construction. This work cannot commence until the Summer of 2024. No work On Site can be started until all permits are received. The existing school must be completely operational during the school year. The overall project completion date is November 29, 2024. Milestone Schedule: Phase 1 Completion is August 18, 2023: Demolition and Site Preparation. Phase 2 June 17, 2024 - August 8, 2024: Renovation of the existing nurse's suite, corridor bathroom renovation and boiler, hot water heating system and domestic hot water heating system. All construction preparation work, project startup, submittals, schedules, approvals, procurement, coordination and other preparatory tasks must commence immediately upon receipt of the Notice to Proceed or the date of the fully executed Owner/Contractor Contract, whichever comes first. The Awarded Contractor must be fully prepared to deliver and install all materials and equipment on the first day of the scheduled On-Site Construction period. The Project includes demolition of the existing 1-story Board Office, adjacent playground area and related site work in preparation for the new construction. The demolition work also includes the removal of Category I non-friable asbestos-containing roofing materials on the Board of Education Building Section (See the Asbestos Abatement Specification by TTI Environmental, Inc. for the Specific Scope of Work). This phase shall be completed on or before August 18, 2023. b. Construction of a 2-story approximately 16,000 SF load bearing masonry and steel building housing ten (10) classrooms with toilet rooms, small group instruction room, Board Offices and a staircase. c. Renovation of existing nurse's suite and adjacent areas to the construction. This work cannot commence until the Summer of 2024. d. Replacement of existing boilers, hot water heating system, and domestic hot water heating system in the existing building. This work cannot commence until the Summer of 2024. e. New playground and soft and hard surface recreation area. f. New stormwater piping of the construction area and the new addition including replacement of the stormwater main on Grant Street to the corner of Park Avenue. g. Coordinate with work not in this scope provided by the Owner's vendors including, but not limited to: Access Control, Security/Cameras, AI Phone, Telephone Systems, Clocks, campus roofing replacement work in the Summer of 2024, window (Kalwall) replacement in the Summer of 2023. Provide associated work with these systems as shown on the responsibility schedule on the electrical drawings. SCOPE OF WORK Page - 2 B. No work On Site can be started until all permits are received. The existing school must be completely operational during the school year. The overall project completion date is November 29, 2024. Milestone Schedule: Phase 1 Completion is August 18, 2023: Demolition and Site Preparation. Phase 2 June 17, 2024 - August 8, 2024: Renovation of the existing nurse's suite, corridor bathroom renovation and boiler, hot water heating system and domestic hot water heating system. C. All construction preparation work, project startup, submittals, schedules, approvals, procurement, coordination and other preparatory tasks must commence immediately upon receipt of the Notice to Proceed or the date of the fully executed Owner/Contractor Contract, whichever comes first. The Awarded Contractor must be fully prepared to deliver and install all materials and equipment on the first day of the scheduled On-Site Construction period. D. The Work will be constructed under one lump sum prime contract |
||||||||||||||||||||||||||||||||||||||||
Details | 1 Story Above Grade, Demolition, Demolition. 2 Stories Above Grade, 16,000 SF.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |