Similar Projects
Last Updated | 01/26/2022 05:18 PM |
Project Title | Sewer Televising And Lining |
Physical Address | View project details and contacts |
City, State (County) | Crystal Lake, IL (McHenry County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide cleaning, televising, installation of cured-in-place-pipe (CIPP, and grouting for sanitary sewers of various sizes). This project requires the awarded contractor to provide: 1. Installation of cured-in-place-pipe (CIPP). Pricing shall include end seals, and the cleaning & televising, and reinstatement of sanitary sewers. 2. Cleaning and televising of identified locations not included in the lining locations. 3. Grouting of lateral connections as identified, and grouting of mainline sanitary sewer main if required. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |