Similar Projects
Golf Practice Facility
New Construction
Design
Rochester, MI

The 9 Dome: Multi-Sport Training Facility
New Construction
Design
Southfield, MI 48075

High School Athletic Complex
Renovation
Bidding
Lansing, MI 48917

Bid Package 009: Pontiac High School Athletic Upgrades
Post-Bid
Pontiac, MI 48340

District Athletic Improvements
Post-Bid
Sparta, MI

CHS Athletic Complex at Coast Guard Soccer Fields
Results
Traverse City, MI

Phase II of the JROTC Field-House Project for the Interior Construction
Results
Flint, MI 48500

Planet Fitness
Build-Out - 15,000 SF
Pending Verification
$3,000,000 est. value
Detroit, MI 48202

Holland Community Aquatic Center: Addition
Addition - 41,140 SF
Pending Verification
Holland, MI 49423

Athletic Complex
Post-Bid
Pellston, MI

Indoor Athletic Field House
Alteration
Results
Brighton, MI

Athletic Complex Bid Packet 1
Post-Bid
Grand Blanc, MI 48439

Cadillac HS Football Stadium Grandstand Repairs 2021
Renovation
Results
Cadillac, MI 49601

Athletic Facility project
New Construction
Post-Bid
Jackson, MI 49201

Jenison Junior High School Additions, Renovation and Athletic Facility Project
Renovation, Addition
Results
Georgetown Township, MI 49428

Last Updated 01/07/2022 11:31 AM
Project Title

Taylor Recreation Center Locker Rooms and Front Desk

Physical Address View project details and contacts
City, State (County) Taylor, MI   (Wayne County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rec Center Locker Rooms & Front Desk Removal of existing fixtures per the specification below. Installation of new fixtures specification below. Two spin studio bathrooms (Men/Women) New stalls New toilet fixtures New urinal fixtures New sink fixtures New sink counter tops New tile New Paint Two locker room bathrooms (Men/Women) New stalls New toilet fixtures New urinal fixtures New sink fixtures New sink counter tops New tiles bathroom area only. New paint throughout except men’s lockers. Specific to just the locker rooms: Shower area in both locker rooms must be completely redone. This includes any and all shower fixtures. New shower stalls need to be installed. Shower area needs to be completely retiled. Front Desk Option 1 Either the front counter and the front desk at the Recreation Center must be refinished.

Details

Athletic Facility, New Construction.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents