Similar Projects
2023 Pipp Resurfacing-Reconstruction
Infrastructure
Bidding
$8,000,000 CJ est. value
Rosa Lees Crossroads, SC 29550

2023 Pipp Resurfacing-Reconstruction
Infrastructure
Bidding
$8,000,000 CJ est. value
Rosa Lees Crossroads, SC 29550

Harry Byrd Highway Recreation Complex - City of Darlington
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Darlington, SC 29532

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Safety Improvements- District 5
Infrastructure
Results

Palmetto Street and Church Street Streetscape
Infrastructure
Results
$500,000 est. value
Florence, SC

Biscuitville / Hartsville
New Construction, Infrastructure - 2,734 SF
Construction
$600,000 CJ est. value
Hartsville, SC 29550

Biscuitville / Hartsville
New Construction, Infrastructure - 2,734 SF
Construction
$600,000 CJ est. value
Hartsville, SC 29550

Railroad Avenue Pump Station and Gravity Sewer Project
Demolition, Infrastructure
Bidding
$900,000 CJ est. value
Lamar, SC 29069

Hydroponic Lab Foundation and Plaza
Renovation, Infrastructure, Alteration
Post-Bid
$75,000 to $90,000 est. value
Hartsville, SC 29550

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Phase 22A Water Service Lines
Infrastructure
Bidding
$750,000 CJ est. value
Darlington, SC 29532

Allen Street Pump Station, Farm Street and South Main Street Sewer Upgrades
Infrastructure, Renovation
Post-Bid
$850,000 CJ est. value
Darlington, SC 29532

Zion Road Pump Station Rehabilitation / Upgrade
Renovation, Infrastructure
Results
$506,325 CJ est. value
Lamar, SC 29069

Hurricane Creek Bridge Replacement Project
Demolition, New Construction, Infrastructure, Renovation
Post-Bid
$500,000 CJ est. value
Darlington, SC 29540

Last Updated 12/19/2023 03:07 PM
Project Title

South Main and East Broad Street Sewer Upgrade

Physical Address View project details and contacts
City, State (County) Darlington, SC 29532   (Darlington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $1,250,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Pipe Bursting 4,377 lf of sewer pipe (10", 15", 18"), rehab 229 vf of manholes, reconnect 55 services, asphalt patch & overlay. Project funded by CDBG. Bidders must comply with Federal requirements, Davis-Bacon Act, Anti-Kickback Act, EEO & Section 3. Minimum wage rates apply. Bid bond, P&P bonds required. Construction Cost Range: 1,000,000 - 1,250,000. The information for Bidders, Bid Form, Contract Plans, Specifications, 5% Bid Bond, Performance and Payment Bond, and other contract documents may be viewed at the office of the engineer, Davis & Brown, 124 West McIver Rd., Florence, SC 29501. This project is being funded in whole or in part by the Community Development Block Grant Program (CDBG). All federal CDBG requirements will apply to the contract. All contractors and subcontractors are required to be registered in the federal System for Award Management (SAM). Bidders on this work will be required to comply with the President's Executive Order No. 11246 & Order No. 11375 which prohibits discrimination in employment regarding race, creed, color, sex, or national origin. Bidders must comply with Title VI if the Civil Rights Act of 1964, the Davis-Bacon Act, the Anti-Kickback Act, the Contract Work Hours and Safety Standards Act, and 40 CFR 33.240. The CDBG application, including the cost estimate, is available for review at the engineer's office. Bidders must make positive efforts to use small and minority-owned business and to offer employment, training and contracting opportunities in accordance with Section 3 of the Housing and Urban Development Act of 1968. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract. The Owner reserves the right to waive any irregularities, or to reject any or all bids. No bidder may withdraw his bid within 90 days after the actual date of the opening. Estimated cost is $1,500,000. Bid, Performance, & Payment bonds are required. Contractor classification of "WL" required. There are no changes to the plans or specifications except for the bid date.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents