Similar Projects
Reunion Ridge Filing No. 1 District Improvements
Post-Bid
Less than $13,000,000 est. value
Centennial, CO

Arapahoe County Justice Center West Employee Parking Lot Slope Stabilization and Full Depth Reclamation
Post-Bid
Centennial, CO 80112

Rehabilitating Curb Ramps on SH83, SH86, SH85 and I-25
Results
$1,000,000 to $5,000,000 est. value

Orchard Road Trail
Results
$350,000 to $400,000 est. value
Centennial, CO 80112

Arapahoe County Covered Walkways
Post-Bid
Centennial, Littleton, CO 80120

Ramp Safety Improvements at the Southbound I-225 at Parker Road
Results
$1,000,000 to $5,000,000 est. value
CO

Greenwood Gulch Undercrossing Improvements
Post-Bid
Greenwood Village, CO

Englewood Recreation Center Water Main, Fire Hydrant Assembly and ADA Ramp Installation
Results
Englewood, CO 80110

Greenwood Gulch Undercrossing
Post-Bid
Centennial, CO 80111

University Boulevard (SH177) Sidewalk Infill
Results
Greenwood Village, CO 80112

Signal Replacement with Curb Ramps and Minor Signing and Striping
Results
$1,000,000 to $5,000,000 est. value

2020 Concrete Catch-Up Program
Results
Less than $420,891 est. value
Centennial, CO

2019 CDBG Shepperd Avenue Project
Results
Less than $323,333 est. value
Littleton, CO 80120

Ada Curb Ramp Upgrades
Results
$1,000,000 to $5,000,000 est. value

Englewood Service Center Drainage and Parking Lot Improvements
Results
Less than $500,000 est. value
Englewood, CO

Last Updated 11/04/2020 04:12 PM
Project Title

Lone Creek Regional Trail Phase 1A

Physical Address View project details and contacts
City, State (County) Centennial, CO 80112   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,004,305
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work performed under this contract generally consists of construction of trail along the south side of Lone Tree Creek from Broncos Parkway on the south to East Caley Avenue on the north. The project includes the demolition of existing trail, curb and gutter, pavement, structures, riprap, and trees. Proposed improvements include earthwork, grading, concrete and asphalt pavement installations, crusher fines trail, sidewalk, curb and gutter, curb ramp installation, retaining walls, striping, signing, storm sewer installation, seed placement, temporary traffic control, and temporary/permanent stormwater management BMPs.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents