Similar Projects
Garfield/22nd Bridge Improvement - City Of Decatur
Infrastructure
Conception
$1,100,000 CJ est. value
Decatur, IL 62526

Garfield/22nd Bridge Improvement - City Of Decatur
Infrastructure
Conception
$1,100,000 CJ est. value
Decatur, IL 62526

Millikin University Student-Athlete Facility
New Construction, Infrastructure, Renovation - 10,870 SF
Design
$6,700,000 CJ est. value
Decatur, IL 62522

Millikin University Student-Athlete Facility
New Construction, Infrastructure, Renovation - 10,870 SF
Design
$6,700,000 CJ est. value
Decatur, IL 62522

New K-8 Magnet School
New Construction, Infrastructure - 81,500 SF
Bidding
$20,000,000 CJ est. value
Decatur, IL 62526

Decatur Airport
Infrastructure
Bidding
Decatur, IL 62523

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Sidewalk Removal, New PCC Sidewalks, Pipe Culverts, Pavement Markings at Various Locations in Warrensburg
Infrastructure
Post-Bid
$2,000,000 est. value
IL

Clarifier Conversion
Renovation
Results
$15,600,000 est. value
Decatur, IL 62521

2022 Valve and Hydrant Replacement
Infrastructure
Results
$480,988 est. value
Decatur, IL

A-O Grade School Pavement Rehabilitation
Infrastructure
Construction
$333,852 CJ est. value
Oreana, IL 62554

A-O Grade School Pavement Rehabilitation
Infrastructure
Construction
$333,852 CJ est. value
Oreana, IL 62554

Archer Daniels Midland Company Protein Processing Plant Expansion
New Construction, Infrastructure
Pending Verification
$300,000,000 CJ est. value
Decatur, IL 62526

HSHS St. Mary's Hospital Renovation
Addition, Renovation, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Decatur, IL 62521

Decatur Raw Water Pipeline From Sludge Lagoon - City of Decatur
Infrastructure
Conception
$960,000 CJ est. value
Decatur, IL 62523

Last Updated 07/01/2023 03:31 AM
Project Title

Seal Coating and Road Repair

Physical Address View project details and contacts
City, State (County) Decatur, IL 62522   (Macon County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: 501 Dipper Lane, Decatur Illinois 62522 Removal and replacement of roadway around the Digester complex, Water tower access road, and various patches around the Sanitary District Plant. Seal coating around the Administration building, and Maintenance building. Restriping of the parking lots adjacent to the maintenance and administration buildings. Replacement of 12" culvert under the Water tower access road.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents