Similar Projects
RR-21-4821 Pavement Repairs
Infrastructure
Bidding

Central Division - Asphalt Paving Maintenance
Post-Bid

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water System Improvements - Contracts 1, 2, and 3
Results
Apple River, IL 61001

Bituminous Resurfacing
Infrastructure
Post-Bid
Galena, IL 61036

Elizabeth 2021 Water System Improvements Contract B Water Main Replacement
Results
Less than $1,100,000 est. value
Elizabeth, IL 61028

West Side Water System Improvements 2021
Demolition, Infrastructure
Post-Bid
Galena, IL

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

2021 Street Repaving Program
Infrastructure
Post-Bid
Galena, IL

2021 General Street Maintenance
Results
$77,269 est. value
Stockton, IL

Water Main Improvements
Infrastructure
Post-Bid

Water Valve Replacement
Results
$7,000 est. value
Galena, IL

Installation of Oversized Chevrons along Interchange Ramp Curves at Various Locations
Infrastructure
Post-Bid

Application of a CRF Restorative Seal as a pavement preservation treatment over the IL 84 roadway centerline rumble strip
Infrastructure
Results
IL

Last Updated 12/10/2021 11:36 AM
Project Title

Water System Improvements 2021 - Contract A Water Tower

Physical Address View project details and contacts
City, State (County) East Dubuque, IL   (Jo Daviess County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,240,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract A Water Tower The Contract A Water Tower project consists of the construction of a 200,000 gallon single pedestal watertower. The project also includes a main extension to the proposed water tower site. Included in the project is various site work associated with the proposed water tower site including earthwork, storm sewer, clearing and grubbing, HMA pavement, seeding, erosion control, etc.

Details

Division 09 - Finishes.
Division 26 - Electrical.
Division 33 - Utilities, Water Utility Storage Tanks, Elevated Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents