Similar Projects
Bleachers Replacements
Alteration
Bidding
Dearborn Heights, Westland, MI 48127

Solid Surface Counter Tops and Sinks at Dearborn Hills GC
Post-Bid
Dearborn, MI 48124

Ross House 2nd Floor and Attic Insulation
Post-Bid
Dearborn, MI 48124

Student Lockers Defer Elementary School
Results
Grosse Pointe, MI

Summit Locker Replacement
Results
Canton, MI 48188

Recreation Center Entry Construction
Alteration
Post-Bid
Detroit, MI

Design/Build Contract for Incineration Complex Fire Repairs
Results
Detroit, MI 48209

Auditorium Curtain Replacement
Alteration
Post-Bid
Lincoln Park, MI

Mcnamara Parking Deck Elastomeric Coating at Detroit Metro Airport
Results
Detroit, MI 48242

FPM - Furnish and Install Acoustical Panels at the STEM Innovation Learning Center - 2021
Alteration
Post-Bid
Detroit, MI

Spray Foam Insulation
Results
Detroit, MI

Prentis Water Filtration - 2022
Alteration
Post-Bid
Detroit, MI 48202

Interior Concaved Surface of the Bandshell
Results
Lincoln Park, MI

Ceiling Tile Replacement
Alteration
Post-Bid
Detroit, MI

Lakes House Grill Bar and Fireplace Refinishing
Alteration
Results
Taylor, MI 48180

Reported 04/28/2022 12:00 AM
Project Title

DFD Installation of Gear Locker

Physical Address View project details and contacts
City, State (County) Detroit, MI   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For the installation of 330 fire gear lockers at 12 Fire Stations.

Details

Division 09 - Finishes.
Division 10 - Specialties, Lockers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents