Last Updated 04/02/2021 02:11 AM
Project Title

Pavement Marking - D04 PM FY2021 (West)

Physical Address View project details and contacts
City, State (County) (Stark, Summit Counties)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For Improving Various Sections Of Portage, Stark, And Summit Counties, Of Ohio, In Accordance With Plans And Specifications By Placing Epoxy Pavement Markings Along Several State Routes And Interstate Routes. Section 0001 Erosion Control Line Alt Item Code Item Description Wt Unit Quantity 0001 832e30000 Erosion Control (Wt: 08) 08 Each 1,000.000 Section 0002 Traffic Control Line Alt Item Code Item Description Wt Unit Quantity 0002 642e00104 Edge Line, 6", Type 1 (Wt: 45) 45 Mile 1,113.770 0003 642e00104 Edge Line, 6", Type 1, Work Order (Wt: 45) 45 Mile 125.000 0004 642e00204 Lane Line, 6", Type 1 (Wt: 45) 45 Mile 279.040 0005 642e00204 Lane Line, 6", Type 1, Work Order (Wt: 45) 45 Mile 75.000 0006 642e00300 Center Line, Type 1 (Wt: 45) 45 Mile 289.020 0007 642e00300 Center Line, Type 1, Work Order (Wt: 45) 45 Mile 35.000 0008 642e00400 Channelizing Line, 8", Type 1 (Wt: 45) 45 Ft 77,760.000 0009 642e00400 Channelizing Line, 8", Type 1, Work Order (Wt: 45) 45 Ft 3,750.000 0010 642e00404 Channelizing Line, 12", Type 1 (Wt: 45) 45 Ft 155,046.000 0011 642e00404 Channelizing Line, 12", Type 1, Work Order (Wt: 45) 45 Ft 1,000.000 0012 642e00500 Stop Line, Type 1 (Wt: 45) 45 Ft 9,601.000 0013 642e00500 Stop Line, Type 1, Work Order (Wt: 45) 45 Ft 650.000 0014 642e00600 Crosswalk Line, Type 1 (Wt: 45) 45 Ft 8,614.000 0015 642e00600 Crosswalk Line, Type 1, Work Order (Wt: 45) 45 Ft 175.000 0016 642e00700 Transverse/Diagonal Line, Type 1 (Wt: 45) 45 Ft 11,793.000 0017 642e00700 Transverse/Diagonal Line, Type 1, Work Order (Wt: 45) 45 Ft 1,250.000 0018 642e00900 Island Marking, Type 1 (Wt: 45) 45 Sf 1,812.000 0019 642e00900 Island Marking, Type 1, Work Order (Wt: 45) 45 Sf 163.000 0020 642e01000 Railroad Symbol Marking, Type 1 (Wt: 45) 45 Each 9.000 0021 642e01000 Railroad Symbol Marking, Type 1, Work Order (Wt: 45) 45 Each 3.000 0022 642e01110 School Symbol Marking, 96", Type 1 (Wt: 45) 45 Each 22.000 0023 642e01110 School Symbol Marking, 96", Type 1, Work Order (Wt: 45) 45 Each 5.000 0024 642e01200 Parking Lot Stall Marking, Type 1 (Wt: 45) 45 Ft 3,824.000 0025 642e01200 Parking Lot Stall Marking, Type 1, Work Order (Wt: 45) 45 Ft 500.000 0026 642e01300 Lane Arrow, Type 1 (Wt: 45) 45 Each 1,328.000 0027 642e01300 Lane Arrow, Type 1, Work Order (Wt: 45) 45 Each 38.000 0028 642e01312 Lane Reduction Arrow, Type 1 (Wt: 45) 45 Each 30.000 0029 642e01312 Lane Reduction Arrow, Type 1, Work Order (Wt: 45) 45 Each 5.000 0030 642e01322 Wrong Way Arrow, Type 1 (Wt: 45) 45 Each 139.000 0031 642e01510 Dotted Line, 6", Type 1 (Wt: 45) 45 Ft 126,205.000 0032 642e01510 Dotted Line, 6", Type 1, Work Order (Wt: 45) 45 Ft 1,290.000 0033 642e01702 Handicap Symbol Marking, Type 1 (Wt: 45) 45 Each 20.000 0034 642e01702 Handicap Symbol Marking, Type 1, Work Order (Wt: 45) 45 Each 3.000 0035 642e30000 Removal Of Pavement Marking, Work Order (Wt: 45) 45 Ft 1,250.000 0036 642e30010 Removal Of Pavement Marking, Work Order (Wt: 45) 45 Sf 250.000 0037 642e30020 Removal Of Pavement Marking, Work Order (Wt: 45) 45 Each 12.000 0038 642e40000 Speed Measurement Marking (Wt: 45) 45 Each 133.000 0039 642e50010 Pavement Marking, Misc.: Urgent Repair, Work Order (Wt: 45) 45 Each 8.000 0040 646e10010 Edge Line, 6", Work Order (Wt: 45) 45 Mile 10.000 0041 646e10110 Lane Line, 6", Work Order (Wt: 45) 45 Mile 10.000 0042 646e10200 Center Line, Work Order (Wt: 45) 45 Mile 5.000 0043 646e10310 Channelizing Line, 12", Work Order (Wt: 45) 45 Ft 1,000.000 0044 646e10400 Stop Line, Work Order (Wt: 45) 45 Ft 100.000 0045 646e10600 Transverse/Diagonal Line, Work Order (Wt: 45) 45 Ft 150.000 0046 646e20300 Lane Arrow, Work Order (Wt: 45) 45 Each 10.000 0047 646e20320 Wrong Way Arrow, Work Order (Wt: 45) 45 Each 10.000 0048 646e20500 Dotted Line, Work Order (Wt: 45) 45 Ft 500.000 Section 0003 Maintenance Of Traffic Line Alt Item Code Item Description Wt Unit Quantity 0049 614e13600 Maintenance Of Traffic, One Lane Closure On a Two Lane Highway, Each 13.000 Work Order (Wt: 39) 39 0050 614e13700 Maintenance Of Traffic, One Lane Closure On a Four Lane Each 13.000undivided Highway, Work Order (Wt: 39) 39 0051 614e13800 Maintenance Of Traffic, One Lane Closure On a 4 Lane Or Greater Each 13.000 Divided Highway, Work Order (Wt: 39) 39 Section 0004 Incidentals Line Alt Item Code Item Description Wt Unit Quantity 0052 103e05000 Premium For Contract Performance Bond And For Payment Bond Ls 1.000 (Wt: Nr) Nr 0053 614e11000 Maintaining Traffic (Wt: 39) 39 Ls 1.000 0054 623e10000 Construction Layout Stakes And Surveying (Wt: Nr) Nr Ls 1.000 0055 624e10000 Mobilization (Wt: Nr) Nr Ls 1.000 0056 624e15001 Mobilization, As Per Plan, Work Order (Wt: Nr) Nr Each 25.000

Details

Division 32 - Exterior Improvements, Paving Specialties, Pavement Markings, Painted Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents