Similar Projects
Panera Bread / Roseville
New Construction, Infrastructure - 4,150 SF
Conception
$1,300,000 CJ est. value
Roseville, MN 55113

Signal Replacement - TH 35E
Infrastructure
Conception
$800,000 CJ est. value
Little Canada, MN 55117

Spring Break - 80-Themed Restaurant and Bar / St. Paul
New Construction, Infrastructure
Design
$935,000 CJ est. value
Saint Paul, MN 55101

Silver Lake Road and I694 Intersection Improvement Project
Infrastructure
Design
$300,000 CJ est. value
New Brighton, MN 55112

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ Construction Manager at Risk - CMR Restore Governor's Residence
Renovation, Infrastructure - 16,000 SF
Bidding
$6,271,000 CJ est. value
Saint Paul, MN 55105

Trash Enclosures Replacement and Site Improvement
New Construction, Infrastructure, Alteration
Post-Bid
Saint Paul, MN 55130

2022 Street and Utility Improvement
Infrastructure
Post-Bid
North Saint Paul, MN

2021 Pipe Bursting
Results
Saint Paul, MN

Underground Utility, Excavation and Construction Services
Infrastructure
Results
MN

Twin Lakes Station Demolition and Sitework
Demolition, Infrastructure
Construction
Roseville, MN 55113

Metro Gold Line Bus Rapid Transit (GBRT)
New Construction, Infrastructure
Construction
$247,954,230 CJ est. value
Saint Paul, MN 55101

Riversedge - Phase 2
New Construction, Infrastructure
Pending Verification
$220,000,000 CJ est. value
Saint Paul, MN 55102

Rice Creek Commons
New Construction, Infrastructure - 1,400,000 SF
Pending Verification
$750,000,000 CJ est. value
Arden Hills, MN 55112

Lexington Avenue North Apartments
New Construction, Infrastructure
Conception
$4,700,000 CJ est. value
Shoreview, MN 55126

Last Updated 01/03/2023 10:01 PM
Project Title

Connection to Municipal Sanitary Sewer and Water

Physical Address View project details and contacts
City, State (County) Mounds View, MN 55112   (Ramsey County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $524,483 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A. The work will done under one prime contract. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Install a new lift station and forcemain to connect to the City of Arden Hills sanitary sewer 2. Install electrical connections to the lift station, 3. Install new water service line to connect to the City of Arden Hills watermain, 4. Abandon the existing lift station and mound system, 5. Miscellaneous items associated with above-mentioned installations; traffic control; erosion control; and road repairs. This project is Targeted Group/Economically Disadvantaged/Veteran-Owned preference. Q/A Deadline. All questions should be submitted no later than October 19th, 2022 to Katy McCann at katy.mccann@state.mn.us. The State is not obligated to answer questions submitted after the question due date and time.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents