Similar Projects
San Souci Road Elevation Design
Infrastructure
Design
WA

CRT5 Repair Construction
Alteration
Design
$1,000,000 est. value
WA

Hazen High School Parking Upgrades Phase 2
Infrastructure
Bidding
$1,195,992 est. value
Renton, WA 98059

Hazen High School Parking Upgrades Phase 2
Infrastructure
Bidding
$1,195,992 est. value
Renton, WA 98059

Curb Management Plan
Infrastructure
Post-Bid
$150,000 to $225,000 est. value
Bellevue, WA 98007

Environmental Consulting Services for 2021 Stormwater Code Amendments
Renovation, Alteration
Post-Bid
$75,000 est. value
Sammamish, WA 98075

Construction of the 34th Avenue S, South 166th Street to South 160th Street
Infrastructure
Results
$6,250,000 to $7,250,000 est. value
Sea-Tac, SeaTac, WA 98188

2021 Sidewalk And ADA Improvements
Infrastructure
Results
$200,000 to $300,000 est. value
Auburn, WA 98092

Stormwater Repairs Phase III Construction
Alteration
Design
$5,200,000 est. value
WA

SR 99, Duwamish River to S Spokane St Vic Paving and ADA Compliance
Infrastructure
Bidding
$2,000,000 to $3,000,000 est. value
Tukwila, WA 98178

Transit Facility Improvements Work Order
Infrastructure
Post-Bid
WA

SR 516 - Jenkins Creek to 185th Pl SE
Infrastructure
Results
Covington, WA 98042

Brickyard to SR 527 Improvements
Term Contract
Design
Bothell, WA 98011

North Bend Way Sidewalk
Infrastructure
Bidding
$295,000 to $305,000 est. value
North Bend, WA 98045

Task Order Unit Price - Curb Ramps and Sidewalks Contract 2
Term Contract, Infrastructure
Post-Bid
Less than $4,000,000 est. value
Seattle, WA

Last Updated 05/17/2022 05:35 AM
Project Title

CIP 30 North Fork McSorley Creek Diversion Project

Physical Address View project details and contacts
City, State (County) Des Moines, WA   (King County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $590,000 to $640,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project consists of approximately 1,100 linear feet of storm sewer pipe and catch basins of various material types and diameters. The Project will also include grinding and overlaying hot mix asphalt pavement, new cement concrete rolled curb and gutter, new cement concrete sidewalk, and other work. he Work is to be performed within the number of working days indicated on the bid proposal from the date of Notice to Proceed issued by the Owner and consists of furnishing all materials, equipment, tools, labor, and other work or items incidental thereto for all of the work necessary to complete the Surface Water Capital Improvements as shown on the drawings and as required for a complete and operating facility as specified in the contract documents.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents