Similar Projects
HOVE Maint VC Fire Suppression System
Bidding
Montezuma Creek, UT 84532

Fire Alarm System Inspections
Bidding
Huntington, UT

Fire Suppression System
Post-Bid
Ogden, UT 84401

La Verkin Elementary School Fire Sprinklers
Post-Bid
La Verkin, UT 84745

Z--Replace Fire Suppression Pump System at Fish Spring
Results
$25,000 to $100,000 est. value
Ibapah, UT

GLCA Fire Extinguisher Service
Results
UT

Fire Alarm Replacement
Post-Bid
Nephi, UT 84648

Bountiful High School Fire Alarm Upgrade
Results
$250,000 to $450,000 est. value
Bountiful, UT 84010

Replace Fire Suppression System at Fish Springs National Wildlife Refuge, UT
Post-Bid
$25,000 to $100,000 est. value
Ibapah, UT

SLCC TRC TB Corridor Ceiling and Fire Sprinkler Upgrade
Results
$990,000 est. value
Salt Lake City, UT 84123

Pioneer Museum Fire Alarm Upgrade
Post-Bid
Salt Lake City, UT

DFCM Construction-UNG Camp Williams Deluge System
Results
$207,000 est. value
Bluffdale, UT 84065

GTI Annex, Fire Sprinkler Project
Post-Bid
Salt Lake City, UT 84115

Construction: Westbrook Elementary, Fire Alarm Upgrade
Results
Less than $100,000 est. value
Taylorsville, UT 84129

Westpointe SSB Fire Suppression System Installation
Results
Less than $250,000 est. value
Salt Lake City, UT 84116

Last Updated 04/23/2020 03:30 PM
Project Title

DFCM Construction - State Hospital Rampton 2 and Forensics Fire Alarm Upgrades

Physical Address View project details and contacts
City, State (County) Provo, UT 84606   (Utah County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes the demolition of existing fire alarm systems, and the furnishing, installation, connection and testing of new microprocessor controlled, intelligent reporting fire alarm equipment required to form complete, operative and coordinated systems to protect each of the following buildings on the campus of the Utah State Hospital in Provo, UT. 1. Forensics Building 2. Rampton 2 Building Fire alarm systems shall include, but not be limited to: Alarm initiating devices, alarm notification appliances, Fire Alarm Control Panels (FACP), remote power supplies, auxiliary control devices and relays, annunciators, conduit and wiring as shown on the drawings. All new fire alarm system components included under this specification shall be of FCI Type and interconnected by a fire alarm network (using existing IP network) with a network control center (FCI Focal Point graphic workstation) installed in the Fire Marshal’s Office of the Administration Building (coordinate location with Utah State Hospital Fire Marshal).

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents