Similar Projects
Intersection Improvement
Infrastructure
Conception
$1,200,000 est. value
North Mankato, MN 56003

Windsor Pond Phase IV
Post-Bid
$592,665 est. value
Saint Peter, MN

2021 Street Seal Coating
Post-Bid
Saint Peter, MN

New Ulm Spring Roadside Parking Area
Results
MN

2021 Street and Utility Improvements
Results
North Mankato, MN

North Smoky Hills Graveling
Renovation
Post-Bid

2021 North 3rd Street Improvements (Livermore Street - Union Street)
Results
$192,200 est. value
Saint Peter, MN 56082

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Belgrade Avenue Street Lighting and Sidewalk Improvements
Results
North Mankato, MN 56003

CSAH 13 Concrete Overlay
Results
Saint Peter, MN

2021 Minnesota Square Park North Plaza
Results
Saint Peter, MN 56082

2021 Site (Hard Surface) Improvements
Results
Mankato, North Mankato, MN

2021 Clark Street Utility and Surface Improvements
Infrastructure
Results
Saint Peter, MN

MNDOT Pavement Rehabilitation at St. Peter Truck Station
Infrastructure
Results
$57,000 est. value
Saint Peter, MN 56082

Grading and Riprap
Infrastructure
Results

Last Updated 07/22/2022 09:09 AM
Project Title

North Mankato Indoor Recreation Center

Physical Address View project details and contacts
City, State (County) North Mankato, MN 56003   (Nicollet County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Fitness Center, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 22, 2022, this project has not yet been awarded. A timeline for award has not yet been established. The indoor rec center is an 85,000 square foot facility with added alternates to increase the facility to 115,000 square feet. The project includes but is not limited to: 1. Site preparation for the facility and 275 parking stalls 2. 4 tennis courts and 6 basketball courts. 3. Center core common space with check-in desk, elevator, stairs, kitchen/concession, seating areas, viewing areas, restrooms, and elevated viewing. together with numerous related items of work, all in accordance with Plans and Specifications. The plans and related documents are available at city hall and by request via dropbox. Any addendums may also be distributed by mail, fax, or email. Award of the contract while requiring payment and performance bond from contractor. The Owner reserves the right to reject any or all bids and to waive any irregularities and informalities therein and to award the Contract to other than the lowest bidder if, in their discretion, the interest of the Owner would be best served thereby. Award of contract is contingent upon the city receiving state bonding appropriation. Project N :21-25205

Details

Parking Space/Stalls, 275 Parking Spaces. 30,000 SF.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Selective Clearing, Earth Moving, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents