Similar Projects
Solid Waste Disposal Services
Term Contract
Design
Montgomery, AL

Dumpster Services
Term Contract
Bidding
Madison, AL

Timber Sale
Infrastructure
Bidding
Montgomery, AL

Waste Collection Services
Post-Bid
Normal, AL 35762

Sale of Timber - Indian Springs Tract
Post-Bid
AL

NE Lagoon Sludge Removal
Results
Ozark, AL

Dredge Material Pumping and Barge Hauling
Results
Mobile, AL

Solid Waste Collection, Disposal, Recycling and Related Services
Infrastructure
Bidding
AL

Lagoon Sludge Removal, Dewatering, Hauling and Disposal at Northeast Lagoon
Post-Bid
Ozark, AL 36361

Debris Monitoring Service
Results
Gulf Shores, AL

Timber for Sale
Post-Bid
AL

Sanitary Sewer Pumping and Hauling
Infrastructure
Results
Huntsville, AL

Trash Disposal Services
Post-Bid
Birmingham, AL 35203

National Forest Timber for Sale NFS in Alabama, The Comp 67 Salvage Sale is Located Within T22N R8
Term Contract
Results
AL

As Needed Trash Debris Removal
Term Contract
Post-Bid
Tuscaloosa, AL

Reported 01/12/2022 12:00 AM
Project Title

Timber Sale

Physical Address View project details and contacts
City, State (County) Heflin, AL   (Cleburne County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The sale area is located on the Talladega NF, Shoal Creek RD, approximately 26 miles due north of Heflin, AL. The sale includes 2101 gross acres, of which an estimated 285 acres are designated for cutting. The methods of cut include about 285 acres of thinning. Timber to be cut within the project area includes an estimated 11,906 TONS of Southern Yellow Pine sawtimber, 605 TONS of Hardwood sawtimber, 6,935 TONS of Softwood-Other pulpwood and 1,899 TONS of Hardwood-Other pulpwood. This Integrated Resource Stewardship Contract also includes two (2) mandatory stewardship work items. The stewardship projects consist of 35 total acres of Midstory Removal Treatment in two separate units.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents