Similar Projects
Buffumville Lake Electrical Upgrades, Charlton, MA
Design
$250,000 to $500,000 est. value
Charlton, MA

Fy21 R1 New England Electric Supply
Term Contract
Bidding

Delivery and Installation of Electrical, Mechanical
Alteration
Bidding
$40,000 to $60,000 est. value
Whitinsville, MA

Water Treatment Plant
Alteration
Sub-Bidding
$7,000,000 est. value
Blackstone, MA 01504

Low Voltage Services/T.S.
Term Contract
Post-Bid
Worcester, MA 01608

Oversight, Monitoring of WHA Energy Performance Contract - Phase II
Post-Bid
Worcester, MA 01605

Lock-Up and Accessibility Improvements, Fitchburg District Courthouse - Filed Sub-Bids
Renovation
Results
Less than $408,317 est. value
Fitchburg, MA 01420

Emergency Generator Maintenance Program Project
Results
Less than $40,000 est. value
Gardner, MA

Bagg Hall Restoration - Filed Sub-Bid
Post-Bid
$1,050,000 est. value
Princeton, MA 01541

Polar Park Downtown Ballpark - Filed Sub-Bid
Results
Worcester, MA

Aegen Thermo Power 75LE Co-Gen Systems
Post-Bid
Less than $110,000 est. value
Worcester, MA 01605

Worcester Challenge and Reach Academy Window/Door/Roof and Boiler Replacement - Sub-Bids
Results
Less than $4,800,000 est. value
Worcester, MA 01609

Aegen Thermo Power 75Le Co-Gen Systems
Post-Bid
Less than $100,000 est. value
Worcester, MA 01605

Electrical Panels Modification Green Acres Basement
Results
$25,000 est. value
Fitchburg, MA 01420

2 Transformers and Bases for UMASS Amherst-Tobin Hal
Post-Bid
Shrewsbury, MA 01545

Reported 06/04/2021 12:00 AM
Project Title

Advanced Metering Infrastructure Implementation

Physical Address View project details and contacts
City, State (County) Holden, MA   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Advanced Metering Infrastructure Implementation which includes approximately 8,500 solid-state electric meters, 7,300 advanced metering infrastructure (AMI) modules for water meters, and data collection infrastructure. The proposal shall include all hardware, software, and professional services required for a fully functional AMI system including integration with the Owner`s existing billing system. Proposal alternates for furnishing approximately 7,300 solid-state water meters and registers, a customer portal, and a meter data management (MDM) system are also included. The Proposer shall furnish all materials, equipment, and incidentals necessary to train and support the Owner in the use of the furnished products and installed systems. Data collection infrastructure, electric meters, water meters, registers and AMI modules shall be installed by the Owner or by others under a separate contract. The Proposer shall furnish all services, materials, equipment, and incidentals necessary to train and support the Owner or installation contractor in the proper installation of data collection infrastructure, meters, registers, and AMI modules.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents