Similar Projects
3.31 MI of Culvert Rehabilitation includes Cleaning Culverts
Bidding
MI

Fibron Trout Pond - Culvert Replacement
Bidding
Okemos, MI 48823

Contractor Qualifications 2019-2020 Infrastructure Improvement Projects
Post-Bid
Southfield, MI 48076

Right of Way Services
Post-Bid
MI

Heidtman Road Culvert Replacement
Results
Less than $77,008 est. value
Ishpeming, MI

Various Lapeer County Hma Paving Projects
Results
Less than $957,972 est. value
Lapeer, MI 48446

Precast Concrete Box Culverts and End Sections
Term Contract
Bidding
Grand Rapids, MI

Dort Reservoir Rehabilitation
Post-Bid
Flint, MI

Cooley Lake Road over Teeple Creek Culvert Replacement
Results
Less than $666,360 est. value
Commerce Township, MI

Beach Erosion Control at Camp Dearborn
Bidding
Milford, MI 48380

Buno Road Bridge Approach Hike Bike Trail Repairs
Post-Bid
Milford, MI

700 Manchester Drive Drainage Improvements
Results
Less than $26,536 est. value
MI

Lakeshore Rip Rap M28 West Roadside Park
Bidding
Ishpeming, MI

Culverts
Post-Bid
Marshall, MI

Peepsock Creek Restoration
Results
Less than $23,200 est. value
Houghton, MI

Last Updated 01/18/2021 01:12 AM
Project Title

2021 Plastic Pipe

Physical Address View project details and contacts
City, State (County) Monroe, MI   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Gasket Joint Pipe: Gasket joint pipe shall be joined with a bell-and-spigot joint. The bell shall be an integral part of the pipe. The gasket shall be installed by the pipe manufacture and covered with a removable wrap to ensure the gasket is free from debris. HP Storm Pipe: Dual wall construction with smooth interior. Gasket joint pipe shall be joined with gasketed integral bell and spigot joint. The gasket shall be installed by the pipe manufacture and covered with a removable wrap to ensure the gasket is free from debris.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents