Similar Projects
Bayou Concrete - Four Points Way / Tallahassee
New Construction, Infrastructure
Conception
Tallahassee, FL 32305

Bayou Concrete - Four Points Way / Tallahassee
New Construction, Infrastructure
Conception
Tallahassee, FL 32305

Asphalt Maintenance-Districtwide Maintenance
Infrastructure
Bidding
$500,000 est. value

Resurfacing
Infrastructure
Bidding
$1,517,909 CJ est. value
Tallahassee, FL 32308

Pavement Striping and Markings
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Tallahassee, FL 32301

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Woodward Avenue Improvements
Infrastructure
Post-Bid
Tallahassee, FL 32304

Welaunee Boulevard Segment 3B Construction Project
Results
Tallahassee, FL 32308

Betton Road Traffic and Pedestrian Enhancement Project and Hickory and Spruce Water Main Improvements
Results
Less than $3,678,098 est. value
Tallahassee, FL 32301

Viridian One
New Construction, Infrastructure - 172,839 SF
Construction
Tallahassee, FL 32304

Magnolias on May
New Construction, Infrastructure
Pending Verification
$6,300,000 CJ est. value
Tallahassee, FL 32301

Magnolias on May
New Construction, Infrastructure
Pending Verification
$6,300,000 CJ est. value
Tallahassee, FL 32301

Babcock Ranch WMA - Deep Freeze South
Infrastructure
Post-Bid
$380,000 est. value
Tallahassee, FL

Richview Road Pass Construction Project
Term Contract
Results
$3,500,000 est. value
Tallahassee, FL 32301

Cubesmart Self Storage
New Construction, Infrastructure - 121,344 SF
Pending Verification
$2,500,000 CJ est. value
Tallahassee, FL 32308

Last Updated 08/02/2022 06:02 PM
Project Title

Pump Station 182 - City of Tallahassee

Physical Address View project details and contacts
City, State (County) Tallahassee, FL 32310   (Leon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $12,435,692 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 02, 2022, this project may not be awarded. Bid received is over the budget. The project scope includes the new construction of a pump station on the south side of Orange Avenue approximately 830 feet west of Catherine Ross Lane. Scope details have not been released. As of August 19, 2020 the project is in planning stage and seeking deviation approval from the City of Tallahassee Development Review Committee. A meeting is scheduled for September 14, 2020. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the second quarter of 2021.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents