Similar Projects
Replacement of Water Heaters and A Boiler
Term Contract
Design
$25,000 to $100,000 est. value
Saint Paul, MN

Mississippi ES Walk-in Cooler and Freezer Refit
Alteration
Bidding
Coon Rapids, MN 55433

Replace PLC Controls At Minnesota Correctional Facility
Alteration
Bidding
$205,700 est. value
Faribault, MN 55021

OWEF - Boilers Comprehensive Ultrasonic Thickness Testing
Term Contract
Post-Bid
Rochester, MN 55904

Nicollet Public Schools Mechanical Equipment - Supply
Post-Bid
Mankato, MN

2021 Mechanical Upgrades
Results
Lakeville, MN 55044

Owatonna 2021 Multi-site Mechanical Upgrades
Results
$900,000 est. value
Owatonna, MN 55060

Southeast Steam Plant Boiler 203 Retube
Alteration
Bidding
Minneapolis, MN

Chiller Maintenance
Post-Bid
Minneapolis, MN

MnDOT Sleepy Eye Truck Station - Electrical and Mechanical
Results
Less than $4,400,000 est. value
Sleepy Eye, MN 56085

East Campus Boiler Replacement
Alteration
Bidding
White Bear Lake, MN

Boiler Services
Term Contract
Post-Bid
Moorhead, MN

MnDOT HRTC Mech Sys Maint, Test, Repairs
Term Contract
Results
Shoreview, MN 55126

2022 Concourse B Heating Upgrades
Infrastructure
Bidding
MN

Furnace Upgrades & Air Quality Improvements
Post-Bid
Crookston, MN 56716

Reported 03/11/2022 12:00 AM
Project Title

Material Recovery Facility Ferrous Magnet Mechanical Installation

Physical Address View project details and contacts
City, State (County) Red Wing, MN 55066   (Goodhue County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The installment of drum magnetic separator to recover ferrous metals from processed municipal solid waste (MSW) material at the City of Red Wing’s RDF Processing Plant located at 1873 Bench St., Red Wing, MN 55066. The Contractor shall provide all necessary supervision, management, labor, tools, equipment, materials and supplies required for all the work to install the drum magnet

Details

Division 05 - Metals, Metal Support Assemblies, Mechanical Metal Supports.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents