Similar Projects
Downtown Infrastructure Project - City of Kingman
Infrastructure
Conception
$7,147,082 est. value
Kingman, AZ 86401

Hilltop Plant Stairs Screens Replacement - City Of Kingman
Alteration
Conception
$500,000 est. value
Kingman, AZ 86401

AutoZone #5704 / Lake Havasu City
New Construction, Infrastructure - 65,000 SF
Design
$1,500,000 CJ est. value
Lake Havasu City, AZ 86404

AutoZone # 5301 / Pomona
New Construction, Infrastructure - 6,800 SF
Design
$1,500,000 CJ est. value
Bullhead City, AZ 86442

City of Kingman (KNG Spot Impvs-Calming feats S)
Infrastructure
Bidding
$335,000 CJ est. value
Kingman, AZ 86401

City of Kingman (KNG Spot Impvs-Calming feats S)
Infrastructure
Bidding
$335,000 CJ est. value
Kingman, AZ 86401

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Box Canyon Excavating of 3 House Pads
Infrastructure
Post-Bid
Peach Springs, AZ

Alamo Road Low Water Crossing
Infrastructure
Results
Kingman, AZ

Community Water and Wastewater Service for Fayeanne Crook Homesite
Infrastructure
Results
Peach Springs, AZ

Nucor Melt Shop Facility
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Kingman, AZ 86401

Trails at Black Mountain
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Bullhead City, AZ 86442

Airway Avenue Drainage Improvements - City of Kingman
Infrastructure
Conception
$2,750,000 est. value
Kingman, AZ 86409

Community Water and Wastewater Service for Fayeanne Crook and Mary Manakaja Homesite - PH 20-F68, WA 17-21
Infrastructure
Design
Peach Springs, AZ 86434

Lift Station 18-1 Wet Well Rehabilitation
Infrastructure
Bidding
$300,000 CJ est. value
Bullhead City, AZ 86442

Last Updated 08/25/2022 02:36 PM
Project Title

Ramar Road Drainage Improvements - City of Bullhead City

Physical Address View project details and contacts
City, State (County) Bullhead City, AZ 86442   (Mohave County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,050,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Ramar Road is designed for storm water to flow along the shoulders. Currently, there is no curb and gutter along this portion of Ramar Rd east of SR95. This has resulted in the undermining of the asphalt and deteriorating the roadway. This project will consist of placing millings 15 feet on each side of the road. This will stabilize the shoulders and therefore less maintenance for staff. Curb and gutter will be installed in areas to control proper drainage. Staff started this project in March 2021 and will continue into Fiscal Year 2023. As of November 05, 2021, this project is currently in the FY 2023-2028 CIP. Design for this project is being completed in house. Information regarding the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents