Similar Projects
Marine Avenue Resurfacing And West Port Plaza Drive Intersection Improvement
Infrastructure
Bidding
Maryland Heights, MO 63043

FY2022 Asphalt Rejuvenation
Infrastructure
Bidding
Clayton, MO

Improving Mueller Road
Infrastructure
Post-Bid
Green Park, MO 63123

Louisiana Calm Street
Infrastructure
Post-Bid
$108,487,725 est. value
Saint Louis, MO

Repave Streetscape at Justice Center
Results
Ballwin, MO 63011

FY22-FY26 On-Call Paving
Term Contract
Results
Olivette, MO

Beverly Avenue and Halcyon Drive Improvements
Infrastructure
Bidding
Glendale, MO 63122

On-Call Roadway Maintenance
Term Contract
Post-Bid
Town and Country, MO

Holloway Road Improvements
Results
Ballwin, MO 63011

2022 Road and Parking Lot Pavement Program
Infrastructure
Bidding
Town and Country, MO

Florissant Road Improvements
Infrastructure
Post-Bid
Ferguson, MO 63135

Asphalt Overlay Improvements
Results
University City, MO

Crack Filling
Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value

Frost Avenue Improvements
Infrastructure
Post-Bid
Ferguson, MO 63135

Asphalt Paving Repair
Results
Saint Louis, MO

Last Updated 03/30/2022 08:18 AM
Project Title

Paving & Engine Room

Physical Address View project details and contacts
City, State (County) Breckenridge Hills, MO 63114   (Saint Louis County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1) Contractor to demo and remove/haul the following: a) 400 lf of 18” curb b) 8,000 sf of 6” asphalt pavement and 6” base/subbase material c) 550 sf of landscaping and spoils 2) Replace all asphalt with 6” stone base and 8" reinforced concrete pavement back to existing grade. Concrete curb to be reinstalled per Figure 1. New paving is to be flush with the east and south side of the Firehouse. 3) Expand southeast parking area as shown on Figure 1. Orientation of revised parking to be finalized upon in field verification of nearby utilities. 4) Furnish and install (2) concrete filled embedded bollards for mechanical units at northeast corner of building. 5) Install new 7’-0” x 3’-6” x 6” equipment pad under existing mechanical units. 6) Remove flagpole and foundation from southeast corner of building. Install new flagpole and foundation southwest near concrete steps. 7) Demo 140 lf of existing retaining wall. New 140 lf retaining wall to be installed 2’-0” east of existing wall per detail 1. Contractor to provide shoring and hauling as required. 8) Expand east driving alley to face of new retaining wall (Approximately 1'-6" to 2'-0")

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents