Similar Projects
Monroe City WWTP Improvements
New Construction
Results
Monroe City, MO

Warrenton WWTP Ultraviolet Disinfection System
New Construction
Post-Bid
Warrenton, MO

Water Reclamation Center Phase 3 Expansion
New Construction
Results
Wentzville, MO

Mississippi Plant Clarifier No. 3 Upgrade
Renovation
Results
Saint Charles, MO 63301

Wastewater Treatment Facility Improvements
New Construction
Results
Jonesburg, MO

Waste Water Treatment Building – Blue River Annex
New Construction
Results
Kansas City, MO

Wastewater Treatment Facility Clarifier Replacement
Renovation
Post-Bid
Gallatin, MO

Wastewater Treatment Facility Improvements
New Construction, Infrastructure
Post-Bid
Laredo, MO

Aeration Diffuser Replacement
Renovation
Post-Bid
Mexico, MO 65265

Last Updated 08/14/2021 07:32 AM
Project Title

Bissell Point WWTF Foam Suppression and Biofilter Rehabilitation

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63107   (Saint Louis City County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition and removal of the existing Biofilter system, which includes the blower, humidification chamber, FRP piping, FRP diffusers, and media. Replacement of new Biofilter system, including blower, humidification chamber, FRP piping, FRP diffusers, and media. Demolition and removal of existing 1” service water piping that is used as sprinkler system for the biofilter system. Replacement of new 1” service water piping and sprinklers to be used as sprinkler system for the biofilter system. Removal and replacement of the existing 6” drain piping that connects the drainage from the biofilter system to the existing ash lagoon pump station. Installation of approximately 450 feet of 4-inch water main as shown on the drawings. Installation of a foam suppression system that is comprised of spray nozzles suspended above the flow channel of the final outfall structure. The system will include a backflow preventor and water service line to a City of St. Louis water main.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents