Similar Projects
Deionized Water Pump
Infrastructure
Bidding
$50,000 est. value
Honolulu, HI

Waipio Heights Wells and Wells I Renovation
Infrastructure
Results
$4,500,000 to $7,500,000 est. value
Waipahu, HI 96797

NAVFAC HI Jbphh Salt Water Pumping System Improvements
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
HI

Kamaile Wells Drainage Improvement and Wells Renovation
Renovation, Infrastructure
Post-Bid
$400,000 est. value
Waianae, HI 96792

Kaamilo Booster and Wells Renovation
Renovation, Alteration
Post-Bid
$1,000,000 to $2,500,000 est. value
Aiea, HI 96701

Submersible Pump Replacement
Infrastructure
Post-Bid
$2,000,000 est. value
Waipahu, HI

Reported 06/10/2022 12:00 AM
Project Title

Maintenance of Wastewater Pumps and Plumbing System

Physical Address View project details and contacts
City, State (County) Lihue, HI 96766   (Kauai County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This is a service / maintenance or supply contract in Lihue, Hawaii. Contact the soliciting agency for additional information. The scope of work consists of the maintenance of wastewater pumps and plumbing system at Lihue Airport. To be eligible for award, bidders must possess valid State of Hawaii Specialty Contractor's "C-37" or "C-37e" License at the time of bidding. Only when required by the proposal, the successful bidder at the time of the execution of the contract shall file good and sufficient performance and payment bonds on the forms furnished by the Department, which bonds shall be in an amount equal to fifty per cent (50%) of the contract price, including amounts estimated to be required for extra work, or in the case of price-term, open-end, or requirements contract under which the total amount to be paid to the Contractor cannot be accurately estimated at the time the contract is to be awarded, the bond amounts shall be as designated in the bid documents. For additional information, contact Maritez Arca Marquez, Project Manager, by phone at (808) 838-8808, by email at maritez.a.marquez@hawaii.gov. The term of this contract shall be for a three (3) year period beginning from the date indicated in the Notice to Proceed from the State The State reserves the right to reject any or all proposals and to waive any defects in said proposals for the best interest of the public.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents