Similar Projects
North County Elementary School - Palm Beach County
New Construction, Infrastructure
Conception
$29,885,542 CJ est. value
West Palm Beach, FL 33401

West Acreage Area Elementary School - Palm Beach County School
New Construction, Infrastructure
Conception
$29,885,542 CJ est. value
West Palm Beach, FL 33401

Tuttle Royale
New Construction, Infrastructure
Design
$279,600,000 CJ est. value
Royal Palm Beach, FL 33411

AutoZone #5999 / Wellington
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Village of Wellington, FL 33414

Heron Parkway Drainage Improvements
Infrastructure
Bidding
$100,000 CJ est. value
Royal Palm Beach, FL 33411

Heron Parkway Drainage Improvements
Infrastructure
Bidding
$100,000 CJ est. value
Royal Palm Beach, FL 33411

CVS #7891 Parking Lot ADA Improvements / Lake Worth - Rebid
Infrastructure
Post-Bid
$100,000 CJ est. value
Lake Worth, FL 33467

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Construction Manager-at-Risk for Belmonte Road and Pershing Way Water and Sewer Improvements
Results
Less than $200,000 est. value
West Palm Beach, FL

South County Reclaimed Water Transmission Pipeline Phase 1A
Results
$7,000,000 est. value
West Palm Beach, FL

RFP Construction Manager at Risk - Sunset Palms Middle School 17- PP New Construction
New Construction, Infrastructure
Construction
$56,000,000 CJ est. value
Boynton Beach, FL 33472

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

The Collection at Boca Town Center
Demolition, New Construction, Infrastructure - 180,029 SF
Pending Verification
$90,000,000 CJ est. value
Boca Raton, FL 33431

Villages of Windsor
New Construction, Infrastructure
Pending Verification
$71,000,000 CJ est. value
Boynton Beach, FL 33426

Western Communities High School - Palm Beach County
New Construction, Infrastructure
Conception
$92,983,968 CJ est. value
West Palm Beach, FL 33401

Last Updated 10/27/2022 09:47 AM
Project Title

Pine Gardens North Infrastructure Improvements - W/S2012)- Town of Jupiter

Physical Address View project details and contacts
City, State (County) Jupiter, FL 33458   (Palm Beach County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $3,273,930 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 27, 2022, this project has been awarded and started construction. *The closed solicitation has been included below for reference: Pine Gardens North consists of commercial and residential parcels served predominantly by asbestos cement (AC) watermains which reached their 40 year useful life in 2017. Replacement of poorly operating valves and hydrants, plus installation of additional valves to allow for better isolation of the system to minimize water service interruptions due to line breaks is recommended. In addition, drainage improvements in the area are needed to reduce the tendency for flooding and to reduce the burden placed on the Seminole Avenue stormwater pump station during large rainfall events. Best management practices for enhanced water quality treatment to reduce pollutants outfalling to the Loxahatchee River and the Intracoastal Waterway will be implemented. This project is included in the Town of Jupiter FY 2022-2026 CIP. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents