Similar Projects
Construction of Detention Basin Facilities for the Westward Pointe Detention Phase 1
Infrastructure
Bidding
TX

Rehabilitation of Pond A
Infrastructure
Bidding
Montgomery, TX

Gulf Intracoastal Waterway - Shoreline Erosion Protection and Containment Dike Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value
Matagorda, TX

NRCS Ditch Repairs North District Area
Post-Bid
TX

Chambers Creek Diversion Channel to Serve Chambers Creek Ranch
Results
TX

Ditch and Culvert Cleaning(Non-Site Spec)
Results
Less than $95,575 est. value
TX

Lateral (Phase II) - 2018 Bond Referendum Project
Post-Bid
Less than $2,324,498 est. value
Edinburg, TX

Storm Drain Boxes Rehabilitation Project
Results
Less than $36,000 est. value
Bridge City, TX 77611

Pleasantview and 11th Street Drainage Improvements
Post-Bid
Less than $3,500,000 est. value
Weslaco, TX 78596

Z--IDIQ for Stream Gage Site Rprs, Oklahoma and Texas
Results

Grading of Roads and Shaping of Ditches and Roadway -058
Post-Bid
Hillsboro, TX 76645

Construction of College Park Ditch Drainage Improvements
Results
TX

Metal Culverts
Post-Bid
Nacogdoches, TX 75961

Brooks City Base Inner Circle Rd. (Louis Bauer Dr. to Research Plaza)
Results
Less than $3,151,000 est. value
San Antonio, TX 78205

Trosper Road Detention Facility Improvements Phase One
Post-Bid
Alton, TX 78573

Last Updated 10/15/2021 01:52 PM
Project Title

El Paso Hills Channel Project

Physical Address View project details and contacts
City, State (County) El Paso, TX   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work covered by this section of the specifications consists of furnishing all labor equipment, supplies, materials, and appurtenances necessary to perform the installation of the concrete lined channel along the El Paso Hills area. The construction shall comply with current local and federal requirements and acceptable construction standards. The County has rough graded (+/- 6” of final grade) the existing earthen drainage way to construct a new drainage channel located at the El Paso Hills area. The Contractor shall be responsible for fine grading and excavation for joints and/or footings for the channel. The Contractor shall include these costs into the price of the project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents