Similar Projects
RFQ D/B - Install Additional Pump on OR Chilled Water Loop
Renovation
Bidding
$250,000 CJ est. value
West Palm Beach, FL 33410

Milton Force Main Interconnect Materials
Infrastructure
Bidding
$700,000 CJ est. value
Milton, FL 32570

Blue Heron Reuse Pumps Replacement
Renovation
Sub-Bidding
$150,000 CJ est. value
Titusville, FL 32780

Justice Center Tower Plumbing Replacement
Renovation
Post-Bid
Fort Myers, FL 33901

RFQ D/B - Design-build Services for Southwest Water Reclamation Facility Second Cloth Media Filter
Renovation
Post-Bid
$4,390,000 CJ est. value
Bradenton, FL 34210

Sources Sought - GSA, Region 4, Tampa, Design-Build Closed Loop Side Stream Filtration System, Water Source ACS and Piping Replacement
Results
$250,000 to $500,000 est. value
Tampa, FL

Plumbing Services for USF
Alteration
Results
Saint Petersburg, Sarasota, Tampa, FL 33620

Infusion Pumps - HHMC Daytona Campus
Infrastructure
Post-Bid
Daytona Beach, FL 32114

Plumbing Construction - Countywide
Term Contract
Results
FL

Ice Pigging Piping Maintenance or Orange County Utilities Field Services Division
Alteration
Post-Bid
FL

Citywide Plumbing Services
Alteration
Results
Titusville, FL

Drinking Fountains-DESO
Term Contract, Alteration
Post-Bid
Bradenton, FL 34209

Plumbing Services
Term Contract, Alteration
Results
Deland, FL 32720

Touchless Plumbing Fixtures (Various Locations)
Alteration
Post-Bid
Sanford, FL

Volusia County Branch Jail Potable Plumbing
Alteration
Results
$150,000 est. value
Daytona Beach, FL 32124

Last Updated 07/21/2023 02:09 PM
Project Title

Central District S-949A Electrical Distribution Building 2

Physical Address View project details and contacts
City, State (County) Key Biscayne, FL 33149   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $151,009,850 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing all materials, labor, and equipment necessary to construct and provide fully functional systems consisting of a new electrical distribution building (EDB-2), and the electrical ductbank connecting the building with its corresponding substations at the Central District Wastewater Treatment Plant. Estimated Range of the Base Bid - $115,414,261.75 to $139,644,880.25

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents