Similar Projects
Pier G 212-213 Shiploader No. 2 Replacement Project at Pier G Metro
Renovation
Bidding
$12,100,000 CJ est. value
Long Beach, CA 90802

Marsh Creek Bridge Replacement
Demolition, Infrastructure
Bidding
$12,182,000 CJ est. value
Clayton, CA 94517

Butterfly Valves for Ramona Pipeline Valve Replacement
Infrastructure
Sub-Bidding
$1,500,000 CJ est. value
San Diego, CA 92101

Plumbing Services
Term Contract
Sub-Bidding
Alhambra, CA 91801

Plumbing Contractor Services
Term Contract
Post-Bid
Concord, CA

Design and Construction of a Monitor Steel Frame Barn Building at the George A. Ingalls Event Center
New Construction, Term Contract, Alteration
Post-Bid
Norco, CA

Plumbing Contractor
Term Contract
Results
Concord, CA

District Wide HVAC Replacements 11 Campuses (COVID) - Plumbing
Alteration
Results
$1,000,000 est. value
Hesperia, CA 92344

Michelson Water Recycling Plant Tertiary Filter Improvements
Renovation, Infrastructure
Bidding
$17,899,000 CJ est. value
Irvine, CA 92612

F-End Piping Modification
Infrastructure
Sub-Bidding
Los Angeles, CA 90012

Airport Plumbing Repairs and Inspections as Requested
Alteration
Post-Bid
Livermore, CA 94551

Industrial Water Treatment Services
Alteration
Results
$100,000 est. value
San Diego, CA

Main Street Sewer Pipe Replacement Project
Infrastructure
Bidding
$800,000 CJ est. value
Alhambra, CA 91801

Backflow Maintenance and Repair Services
Term Contract
Sub-Bidding
Coalinga, CA 93210

On-Site Non-Potable Water Reuse Strategy
Alteration
Post-Bid
$250,000 est. value
Sacramento, CA

Last Updated 03/20/2023 12:09 AM
Project Title

Bay Division Pipeline No. 3 and 4 Slip Lining at Lafayette Street

Physical Address View project details and contacts
City, State (County) Santa Clara, CA 95054   (Santa Clara County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $5,662,200 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The objective of the project is to protect Bay Division Pipeline Nos. 3 and 4 from future loads imparted by Union Pacific Railroad's proposed new tracks by slip lining the pipelines with welded steel pipe at the railroad crossing at Lafayette Street in Santa Clara. The work is to be performed in Santa Clara County, California. ESTIMATED COST between $6,500,000 and $7,000,000 Bid discounts may be applied as per San Francisco Administrative Code Chapter 14B. The Local Business Enterprise (LBE) subcontracting requirement is 11.00%. The LBE subcontracting requirement can only be met with certified San Francisco Micro and Small-LBEs and SFPUC Micro & Small-LBEs. The LBE subcontractor participation requirement for this Contract is below 20%, as the work is highly specialized because the main scope of work is to procure/fabricate large diameter steel pipe and slipline two large diameter pipelines. Prime and Joint Venture level LBE participation cannot be counted towards meeting any of the LBE subcontracting requirement(s). LBE subcontractors must be certified within the scope of work they are being listed to perform. All Bidders shall submit documented Good Faith efforts with their Bids as directed on Form 2B, except those who exceed the above-stated subcontracting requirement(s) by at least 35%. Refer to Attachment 6. Failure to comply with Chapter 14B requirements may result in a Bid being deemed non-responsive and ineligible for Contract award. Please contact Kate Svyatets at 925-967-2154 or kate.svyatets@sfgov.org for further information. Subcontracting opportunities may include, but not limited, to the following major types of work: earthwork, demolition, pipeline installation/ slip lining, welding, coating work, and trucking. Please refer to Section 01 60 00 in the Specifications regarding the purchase of equipment to achieve the LBE subcontracting participation requirement. SFPUC encourages Bidders to submit a Safety Prequalification Form at least 3-weeks prior to the date of Bid opening. Bidders are required to pass the Safety Prequalification prior to SFPUC considering their bid submission complete. SFPUC will notify Bidders who have passed the Safety Prequalification prior to or on the date of Bid opening. Refer to Section 00 21 13 - Instructions to Bidders, "Bidder Qualifications" and Section 00 45 12 - Safety Prequalification for additional information. Bidders that have completed/passed the WD-2890 Safety Prequalification do not need to re-submit the WD-2890R Safety Prequalification Form (Section 00 45 12). A Class "A" California Contractors License is required to bid. Furthermore, each listed subcontractor must possess appropriate active licenses for the work each subcontractor will be performing. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Addendum 1 and 2 have been posted for this project. please contact the owner for this information.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents